Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Table of Contents

...

Date/Time

Action

Aircraft Assembly

Houston should be ready to go with the RFD900x as well as with any relevant hardware for testing ZP

9pm

Pre-flight Preparation

  • Ensure checklists for Houston

  • Ensure all items in checklist are followed

9am

Flight brief from flight test lead

10am

Loading onto the Car

Take your water bottle with you. Go washroom before we leave!

10am

Drive to the test ground

10am-2pm

Flight Testing

2:15pm

Debrief

🧯 Aircraft Incident Procedures

Incident

Procedure

Crash

Outline the procedure for who will go to handle the aircraft in the event of a crash, what should be done, were emergency equipment is, etc.

Flyaway

Outline the procedure for flyaways. List relevant contact information for local authorities and plans of action to recover control of the aircraft

Configuration Error

Outline steps to take in the event of a configuration issue with the aircraft

Injury

Property Damage

🔧 Week-Before To-Do List

...

Item

Owner

  •  Use Flight-Post Mortem to Debrief

Aidan Bowers (Deactivated) Daniel Puratich

  •  Discard of damaged batteries

N/A

  •  Discharge used batteries to storage voltage

Hamza Ali

...