https://www.aerialevolution.ca/annual-student-competition/

Tasks and Milestones

https://www.aerialevolution.ca/wp-content/uploads/2023/02/2023-AEAC-Competition-RFP-v2.2-15-February-2023.pdf

Registration

Due: @ 5:00pm

...

  • Landing pads may have obstructions within 2m or a weight restriction of 5kg

  • QR code with list of transport routes (# passengers, way points, max weight, pad conditions, etc.)

    • Will be received @ 3:00pm

    • Flight plan (with route orders) due within 60 minutes @ 4:00pm

    • Flight Plan must include at least 50% of provided routes

    • Use of automated algorithms will earn additional points

    • There will be a maximum of 50 routes (50 point to point routes)

  • If a route requires moving more passengers than can be carried, multiple flights must be completed

  • Most landing pads will be BVLOS

  • When passengers are ‘on board’, green ‘Pax aboard’ light must be illuminated, visible from 360deg around aircraft

  • A landing only counts if the aircraft is fully on the pad and rotors are off for 15 seconds

  • Batteries may be swapped at launch point if there are no passengers (Waypoint Alpha)

Expand
titlePoints Distribution

Criteria

Score

Revenue

120

Team with highest earnings

120

Other teams pro-rata points in comparison to highest earning team

Route Completion:

Each completion of a full Flight Plan

20

Each skipped route on a Flight Plan

-5

Computer Optimization:

20

An optimization algorithm uses the QR code as provided, outputs a Flight Plan with no manual intervention

20

Total

140 +/- route bonus

...

  • Only electric propulsion (including solar cells, batteries or fuel cell)

  • A single aircraft must be used for both phases

  • There must be 2 square inches of flat surface for a GPS tracking device provided by the competition on top of the bodywork

  • Must look good: No wires hanging, should have exterior labelling, windows, etc.

  • Data links may be radio, infrared, etc. but no tethers

  • Needs a flight readiness button to allow UAMS to operate once passengers are loaded.

  • Licenses for licensed radio frequency bands.

  • Each flight window will be approximately 30-45 minutes (subject to change)

  • ‘Flight crew’ is maximum of 5 members, who are the only ones that may be present during the flight window

  • Pilots must remain at the launch point for the task

  • Pilots must hold an Advanced Pilot certificate

...