Subteam

Tasks (replace these w/asana links when you can)

Owner

Mechanical (Frame)

Fix Tail Section:

Fix Cabin on Cornflakes:

Lengthen landing gear (switch to 16” prop, add more landing gear clearance):

Add velcro for better fastening of lid:

Alison Thompson

Electrical

Attach new servo: https://app.asana.com/0/1203349931374647/1204140734762158

  • Identify if new servos need to be purchased if no old ones exist

Nolan Haines

Sysint

End-to-end functionality test: https://app.asana.com/0/1203349931374647/1204140737238144 : Aidan Bowers (Deactivated)

  • RC Link with antenna

  • Control surfaces work (all servos)

  • Motors run the right direction

  • GPS, IMU works

  • Calibration of compass, accelerometer

Handle purchasing of batteries: Nathan Green

  • Get new Tournigy batteries to be used in comp that are better than current ones

Prepare Houston for Flight: Ethan Abraham

  • Verify all motor directions, RC Link, etc.

  • Fix pitch directions, etc.

  • Mount + wire VTX

  • Add second battery for VTX

Aidan Bowers (Deactivated)

Hamza Ali

Logistics

Logistics

  • ensure vehicles, submit FTR, verify bookings.

  • Submit flight test plan

  • Vehicle logistics

  • Ensure checklists are being followed

  • Fill flight box

Hardy Yu

...

Component

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Update re latest date for readiness:

  • Best estimate of readiness: 3rd April - doublecheck with Conall

Conall Kingshott

Megan Spee

Electrical

Updates:

  • State of Icarus wiring diagram - Complete by 2-April-2023

  • Questions on power architecture and other follow-up from RFC re last week

  • Information: 2023 System Architecture

  • Develop system block diagram

  • Top-down physical electronics layout

  • SMEs:

  • Rayyan:

  • Michael:

    • Added components from system architecture document to drawio schematic, started connecting new components in schematic

    • Next steps involve reaching out to team members for more detailed information to connect the rest of the components.

Nolan Haines

Michael Botros