Flight Test Outlook
Date | Note |
---|---|
April 1st | If weather permitting:
|
April 2nd |
|
April 8th |
|
April 9th | If needed:
|
April 16th | Hold for: Icarus CS2
|
April 22ndContinue tasks from CS2 | Comp flightline (if possible) run through |
April 29th | 1 week before comp - full systems check & second full comp flightline run through |
Table of Contents | ||||
---|---|---|---|---|
|
April 2nd
...
Subteam
...
Tasks (replace these w/asana links when you can)
...
Owner
...
Mechanical (Frame)
Fix Tail Section:
Fix Cabin on Cornflakes:
Lengthen landing gear (switch to 16” prop, add more landing gear clearance):
Add velcro for better fastening of lid:
...
...
Electrical
Attach new servo: https://app.asana.com/0/1203349931374647/1204140734762158
Identify if new servos need to be purchased if no old ones exist
...
...
Sysint
...
End-to-end functionality test: https://app.asana.com/0/1203349931374647/1204140737238144 : Aidan Bowers (Deactivated)
RC Link with antenna
Control surfaces work (all servos)
Motors run the right direction
GPS, IMU works
Calibration of compass, accelerometer
Prepare Houston for Flight: Ethan Abraham
Verify all motor directions, RC Link, etc.
Fix pitch directions, etc.
Mount + wire VTX
Add second battery for VTX
...
Logistics
...
Logistics
ensure vehicles, submit FTR, verify bookings.
Submit flight test plan
Vehicle logistics
Ensure checklists are being followed
Fill flight box
...
April 2nd
Subteam | Tasks (replace these w/asana links when you can) | Owner |
---|---|---|
Mechanical | ICARUS frame Ready: https://app.asana.com/0/1203349931374647/1204285821170036 | |
Electrical | Icarus Wired: https://app.asana.com/0/1203349931374647/1204285821170041 | |
Sysint | Video Receive Tower Ready: https://app.asana.com/0/1203349931374647/1204140737238162
| |
Logistics | Logistics
|
...