Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Tip

Make sure to update the Title following the format “Jan 01, 2020 Flight Test”

...

Requested by:

Megan Spee

Required Sub-teams

  •  Mech
  •  Electrical
  •  EFS
  •  CV
  •  Operation
  •  Sys-Int

Requested Date

Location and Time

July 9th 2023 @ WRESTRC, noon-ish

Summary & Goals

  • CV Auto

    • Successfully detect the landing pad using Vanny

Approved?

Yes ✅ / Pending 🟨 / No 🛑

  • Need camera, jetson, jetson power support

...

Approved?

...

  • Need the jetson zip-tied on

  • Need jetson connections fixed up

  • have EE/CV assess the current wiring setup - may need to add a buck

👥 Required Persons During Test

...

Date/Time

Action

Aircraft Assembly

If aircraft assembly is complicated, outline dates of various milestones that should be met to ensure we don't rush to complete work at the last minute.

Pre-flight Preparation

Feel free to not come at 9 if you don’t have a lot workload. During this time get snack if needed

Required persons for preflight preparation show up at bay

Flight test lead breifly assign task for preparation work

Flight brief from flight test lead

Loading onto the Car

Take your water bottle with you. Go washroom before we leave!

Drive to the test ground

Flight Testing

Debrief

🧯 Aircraft Incident Procedures

Incident

Procedure

Crash

Outline the procedure for who will go to handle the aircraft in the event of a crash, what should be done, were emergency equipment is, etc.

Flyaway

Outline the procedure for flyaways. List relevant contact information for local authorities and plans of action to recover control of the aircraft

Configuration Error

Outline steps to take in the event of a configuration issue with the aircraft

Injury

Property Damage

🔧 Week-Before To-Do List

...