Meeting overviewMeeting to discuss state of Competition Aircraft big quad.
|
Table of Contents |
---|
🫂 Attendance
🗒️ The Weekly Recap
✈️ Flight Tests:
Autotune works. well.
📦 New arrivals
✅ Open action items
Conall Kingshott Composites stuff never properly setup, not a problem that we had not given to him, Graeme figuring everything out and then letting us know. Composite manufacturing in the next two weeks.
#electrical: Crimps, connectors, housings, signal analyzers, etc.
📝 Meeting minutes
Frame Updates 🚁
Status | ||||
---|---|---|---|---|
|
Composites in the next two weeks, before midsun gets it in (midsuns stuff is massive and takes a while)
Try and get as many people in the room as possible.
Frame updates
Starting on landing gear printsMCMaster Carr order for standoff stuff & miscellaneous items.Talking to Les (machinist). Will likely have to do a lot of this ourselves and then send it off to him to finish (battlebots causing issues).
Sensor Updates 📏
RTK GPS? Has antenna and control box.One M9N, one RTK.Mechanically identical, mounting pattern is the same.will remain on posts (similar to vanny, except further).
RF updates 🌐
Need notch filters? 5W video very much stepping on other freqs? not sure…. currently investigatingCould get SDRPlays. (RSP1A → to be acquired)
Motor 3-phase connectors ✅
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
3-phase connectors decided:
https://www.tme.com/ca/en/details/mt30-m/dc-power-connectors/amass/MT-30for inner-hub-to-tube connector3.5mm Bulletfor end of tube - motor connector.Seems like we have enough, is there a reason why we can’t use the ones in a connector box on the EE shelf?
EE still needs to source Motor/ESC wire
Should be a small task
Found plenty of bullet connectors in the bay
Battery PDB Distribution
Status | ||||
---|---|---|---|---|
|
How are batteries going to be arranged in series/parallel?Scuffed diagram that needs explanation of potential implementation for three 12S batteries
How will our board support this layout?Thoughts:2 PM02D’s (2 banks of batteries), parallel after. Potentially on either side of the battery.Junction point closer to the edge of the board (away from the pixhawk).
Do we have two PM02Ds in the bay?
If so, electrical member needs to test the current sharing capability of the power modules to see if we can get even current draw from each power module
Potentially borrow E-Load from Midnight sun
Airside Electrical Layout
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Where each component goes needs to be added to the architecture document.For Battery connections, 8 AWG can be used to handle 75A continuous (maybe a little lower if stranded)Stranded likely needed in order to have the required flexibilityTwo power modules in parallel, two banks of batteries in parallel.
For motor connections, each motor draws around 15A (determined when discussing MT-30s)14 AWG wire (24A) should be enough for ESC connections to PDB
Wire gauge for sensorsCrimpersElectrical Wiring diagram experiencing slow progress (unfortunately)Some of the modules are in the diagram but things need to start getting connected
Power distribution wiring about halfway done
Do we have all the JST-GH connectors (housings) that we need to connect to pixhawk
Took a quick look in the connectors box and only found connectors for 5 pin
Do we need to order more from the other kinds?
Need selection of proper wire gauges, types, etc.