Tip |
---|
Make sure to update the Title following the format “Jan 01, 2020 Flight Test” |
...
Tests | Success Criteria | Requirements | Outcome |
---|---|---|---|
CV camera footage logging |
|
|
|
QR code mission planner integration |
|
| |
Autotune on pitch/roll | |||
ZP3.5 first milestone check |
|
|
...
Date/Time | Action |
---|---|
Aircraft Assembly If aircraft assembly is complicated, outline dates of various milestones that should be met to ensure we don't rush to complete work at the last minute. | |
Pre-flight Preparation Feel free to not come at 9 if you don’t have a lot workload. During this time get snack if needed | |
July 23, 10 am | Required persons for preflight preparation show up at bay Flight test lead breifly assign task for preparation work |
July 23, 11:30 am | Flight brief from flight test lead |
July 23, 12 pm | Loading onto the Car Take your water bottle with you. Go washroom before we leave! |
July 23, 1 pm | Drive to the test ground |
July 23, 1-2:45 pm | Flight Testing |
July 23, 3 pm | Debrief |
🧯 Aircraft Incident Procedures
Incident | Procedure |
---|---|
Crash | Outline the procedure for who will go to handle the aircraft in the event of a crash, what should be done, were emergency equipment is, etc. |
Flyaway | Outline the procedure for flyaways. List relevant contact information for local authorities and plans of action to recover control of the aircraft |
Configuration Error | Outline steps to take in the event of a configuration issue with the aircraft |
Injury | |
Property Damage |
🔧 Week-Before To-Do List
...