Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • ESC->PDB Dshot wiring complete

  • MT30s put on motors

    • Lengths roughly measured for motor->ESC wires, need to be cut+soldered

  • Battery harness design done, wires cut to length, two XT90s soldered

  • No work done on VTX, saved for next session.

  • No work done on PDB->Pix, saved for next session.

  • Note: Everything related to this session was put into the Pegasus 2 Frame box, with the frame. (located at the right side of second row of back shelf; behind EE shelf as of the time of writing)

...

Session 2 (Wednesday July 17):

Plan:

...

Work completed:

  • More battery harness XT90s soldered

Session 3 (Monday July 22):