...
Currently waiting on aileron design as it may end up splitting ribs into 2 pieces
Will still want to some test cutting of ribs next week
Need to ask RPC about tolerance for spar
The laser cutter has a kerf (thickness of cut) of 0.1-0.175mm
For manufacturing, start with tolerance of -0.175mm, test for fit with box tube and try again
Need to keep pitot tube design in mind
Half on the wings to avoid prop wash
Need to keep gps mounting in mind
Most likely at the tip of the wing