Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • load test on buck converter: use eload to fully saturate the buck and verify you get the output current expected (up to 1A)

  • Efficiency calculations: 12V, 24V, 50V

...

Oscilloscope

  • scope switch node

  • probing output net for voltage stability with oscilloscopeload transient testing

then handoff to firmware for testing

...