Item | Presenter | Notes |
---|
Comp Design | Alison Thompson | Both payloads ready for manufacturing, order has been placed for parts Megan Spee list of parts that need to be made? Angled landing gear almost done, finalizing angle and adding stopper to account for unknown exact barrel dimensions
|
Eclipse (Fixed-Wing) Airframe | Evan Janakievski | |
Tracking Antenna | | |
Fuselage | | |
Empennage | | New servos ordered. Lighter than what was planned initially. 1 servo for each side for the elevator, 1 servo for the rudder. Mounted inside the stabilizers The Airfoil of HS was changed to NACA0012 from 0009 since it was too small to mount the servo inside.

|
Eclipse Wings | Nathaniel Li | |
Ground Station | Smile Khatri | |
Peggy 2 Jig | Victor Sun Shawn Henry Dragon | We have the plan we were just waiting for Victor Sun to get PDM working, seeing as that hasn’t happened CAD will be done these next couple days We are going to need new holes cut into the baseplate on either side of each battery for the jig
|
New tasks | Smile Khatri | https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=41641fcc-42d1-56b5-a9ab-6121246aaae8&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=f94dd797-f6a8-5503-8a0b-cc86c4a2eb13&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809c |
Mech leadership roles | Smile Khatri | |