Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Board Name

status

blockers

plan going forward

GPS Breakout

  • Alternative GPS selected

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • electrical validation done. need firmware. 3x boards all ready to go right now

  • Maybe make spares since we are using all we made?

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94

6s Power Module

  • Waiting for Diodes to come in

  • Power rails working

  • Still waiting for Firmware

 

Water controller

done !

...

  • Jerry Tian For Peggy 2

  • Water controller making (prob in more detail above)

    • Will install Dec 13 afternoon lol (after I finish finals)

  • Comp relevant PCBAs

    • Water controller

    • Water controller Rev 2

    • LED REV 4

    • Tracking antenna controller rev2

    • Unified VTX - descoped from this comp cycle

    • Single servo driver

    • Pi interface rev c

  • Big push now is for Dec 14 flight test

...