Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Next Work Session

Alison Thompson

  • Work session this Saturday at 9am

    • We will start with machining spacers for the fixed wing frame

    • Cut CF tube for tank payload

    • Payload assembly

    • Angled landing gear assembly (likely epoxy)

    • Box tube for spars and tail boom

Updates

Item

Presenter

Notes

Comp Design

Alison Thompson

  • Both payloads ready for manufacturing, order has been placed for partsMegan Spee list of parts that need to be made?

  • Angled landing gear almost done, finalizing angle and adding stopper to account for unknown exact barrel dimensions

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

Fuselage

Empennage
  • Updates on manufacturing? What needs to happen this weekend?

    • Will get parts needing to be water jet submitted today or tomorrowAll parts dropped off at student machine shop as well as E3 machine shop

    • Spacers need to be machined as well as spars (not sure if spars are finalized from everyone)

      • Drawings for spacers need a final look over but should be fine, simple lathe task

Tracking Antenna

      • Spars drawings will be completed tomorrow for review, holes were added today for gps mount

Empennage

Thushanth Parameswaran

Eclipse Wings

Nathaniel Li

image-20241114-235047.pngImage Added
  • If you guys need to, feel free to work on it off-line and send Smile Khatri the CAD to add into PDM

Ground Station

Smile Khatri

Peggy 2 Jig

Victor Sun Shawn Henry Dragon

  • We have the plan we were just waiting for Victor Sun to get PDM working, seeing as that hasn’t happened CAD will be done these next couple days

  • We are going to need new holes cut into the baseplate on either side of each battery for the jig

New tasks

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=41641fcc-42d1-56b5-a9ab-6121246aaae8&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=f94dd797-f6a8-5503-8a0b-cc86c4a2eb13&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=5b843151-aca6-43bd-8bfc-266b6a19b35e&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=cccd9495-792f-4bf8-96b6-611973e48e9b&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

Mech leadership roles

Smile Khatri

...