Team Sync

  • Mechanical: Reconstruct the prototype frame, assemble carbon fibre frame, grabber construction and assembly, gimbal reconstructed.

    • New grabber construction underway

    • Next iteration prototype frame being built, grabber redesigned for less theraband, strengthening on arms

  • Electrical: Need battery measuring setup on PDB. Need control board for the grabber.

  • Firmware: Controls and Teleop remaining, safety FreeRTOS rearchitecture. Path Manger remaining. Telemetry for ground and aircraft.

    • Telemetry Manager complete and almost merged in.

    • Path Manager almost complete, more detailed updates required.

    • Controls and Teleop, FreeRTOS setup needs to be completed so sensor fusion works, this should be the last thing before PID tuning.

    • Grabber control, driver board finalized, controls for that will be written on safety. Controlled by RC.

  • Computer Vision: People detection model needs to be finalized, OpenHD needs to be stabilized. QR Scan needs to be system tested w/ communications. Ground communication needs to be finalized.

    • Gimbal Control: Confirm w/ Sahil we just need to provide serial output to the Arudino to make this work.

  • No labels