Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Current »

General Team Status/Schedule:

  • Meeting times:

    • EE Meeting: Thursdays 9 PM EST E5 1006

    • Leads Meeting: Wednesday 9 PM EST E5 1006

    • Team Competition Aircraft Sync: Tuesday 9 PM

  • Attendance:

🔗 Quick Links:

🍍 Updates this week!

Admin:

Active PCB Projects

High Current Power Module (Taim, Steven)

  • Got PCB layout reviewed, will address shortly before starting routing

  • Steven Wang

12S ESC (Ethan, Chris)

  • Ethan in India

6S ESC (Rayyan, Mostafa)

  • Mostafa: Attended buck control session by Farris, and decided on using electrolytic capacitor for output cap, started reading into current sense.

  • Rayyan: Have Power MOSFETs selection down to a couple MOSFETs. Will have selection finalized by next meeting along with majority of everything else related to gate driver circuit.

    • I also attended Farris' Control Loop Learning Session and learned a lot and feel big brain now.

  • Both of have our Asana goals updated.

    • Rayyan: Component selection for gate driver circuit done by Nov 30th. MCU circuit by winter break. By end of winter break to have schematics.

    • Mostafa: Buck and current sense component selection done by Nov 30ths. Schematics done by end of winter break.

LED Controller (Neel, Parker)

  • Setup another meeting to go over component selection.

    • Meet before next Sync (Saturday)

    • Neel will be gone start of December. Plan to have at least component selection and parts ordered. Leaving assembly and testing.

ELRS Gemini (Michael, Farris)

Drone Battery PCB (Farris)

  • Still need to take some measurements & draft a rough outline to determine price & power capabilities, will probably be some delay on this though as I’m bogged down by schoolwork

PDB (Tom)

  • Figured out which components are required, now need to determine component values.

Tracking Antenna (Nolan, Hardy, Michael)

  • Nolan Haines Hardy Yu Michael Botros Please update.

  • Schematic is close to being finished for voltage sensing. Measuring the differential voltage between all 6 cells. Low battery indicator and automatic shutoff.

  • Overcurrent protection, SD Card, Shield connectors remaining.

  • Goal to have board done before exam season.

12S Servo Module (Jerry)

  • Jerry: pushed deadline by 1 week to Nov 23rd since I'm not confident with PCB trace routing.

    • Will talk to Daniel.

ZP3 Rework (Anthony)

https://discord.com/channels/776618956638388305/1111453504721137685

Anthony Zhelnakov

Capacitor Analysis for Drone (Side Quest):

Anthony Zhelnakov

https://discord.com/channels/776618956638388305/1124835115239997520
https://oscarliang.com/capacitors-mini-quad/
https://noirfpv.com/drone-capacitors/
https://www.getfpv.com/learn/new-to-fpv/all-about-multirotor-fpv-drone-electronic-speed-controller/
https://risingsunfpv.com/blogs/helpful-guides/what-is-a-capacitor

New Members!

Mostafa Hussein

Anthony Zhelnakov

  • No labels