Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Out of scope for this test

  • Complete Pegasus 2 Tuning and be sure we are happy with the tune

    • We will not be doing this because it is risky and not really necessary right now.

    • Evaluate the tune we have right now

      • See how it feels with full stick reflections

    • Run autotune again on a higher aggressiveness

      • Last time we ran at 0.007 so maybe go up to 0.008 now that we’re more comfy with it

      • Hopefully less wind then last time

    • manually tune the rest

      • hoping this isnt really needed

      • oscillation => lower PID

      • slow response => increase PID

      • underdamped => increase P/D ratio

      • overdamped (motors heating up0 => decrease P/D ratio

Goals for this test

  • Complete a 1.5 km range test on Pegasus 2 to measure dropped packets

    • Do this without even flying the drone, put it in a car, drive it a kilometer down the road, measure packet loss.

    • Flying the drone is a risk

    • max distance we need at comp is 1.15 km

    • Can we make sure that when we do range tests, we log continuous data on both tx/rx side? Would be nice to know how our tpwr fluctuates as a f'n of distance

    • Can we try to test different antenna orientations? I.e. if we rotate the drone does it severely impact signal quality.

    • Can we try this test with/without other ELRS rx's active (maybe for ex: houston) near the pegasus basestation? I know they say elrs<->elrs interference is low but I want to see how low

  • Test the analog video system and relay system on Pegasus 2

    • Asana tasks to set this up

    • does not require flight, do at same time as mavlinkrc rank test

  • Test Geolocation system on Houston

    • Tasks in Asana to set this up

    • this will require

      • driving to wrestrc

      • Integrate and test hardware leading up to this

        • RPi integration

      • Autonomy preparation

        • Geolocation software exists and will be run on Houston

    • houston is ready for this test hardware wise

Attendees

Timeline Plan

  • Start charging batts at 9am

    • only charge one set of batts for Pegasus 2

  • Leave Bay 10am

  • Debrief starts at 12

  • Done 1pm

  • No labels