Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Attendance

Team Announcements

Item

Presenter

Notes

Next Flight Test

Evan Janakievski

2025-01-26. Come watch the drones fly! It’s a great way to see what your work goes towards!

Next Work Session

Other Announcements

Evan Janakievski

https://discord.com/channels/776618956638388305/1144610189832630292/1328408249443029105

Updates

Item

Presenter

Notes

Comp Frame

Alison Thompson

Composites

Evan Janakievski

Are we making new battery shrouds?

Eclipse Frame

Evan Janakievski

Frame is fully assembled!

Only thing left is adding cutouts to the wing spars for EE’s harness

Eclipse Wings

Nathaniel Li

  • 3D prints ready, 1 PLA print and 1 ABS print

  • Laser cutting balsa is ready to be done

    • I’ve prepared the DWG for the ribs, someone just needs to put it on a USB and bring the balsa to the RPC to get it cut

    • Can I get someone who’d like to do this? I’ll message you with detailed instructions

  • Once 3d prints and balsa are cut, assembling can start!

    • If possible, this can be done at the next work session

Eclipse Fuselage

Sohee Yoon

  • The frames for the fuselage have been drawn out. So for this weeks work session is anyone interested in cutting out the frames?

    • Or if anyone doesn’t have much to do at the work session they're welcome to cut out the frames

Eclipse Empennage & Landing Gear

Smile Khatri

  • Things left:

    • 3D print elevator and rudder and test fit onto the empennage

    • Make linkage rods to connect the servos with the control surface

  • Landing gear:

    • Missing one piece for rear landing gear that will be made sometime soon

    • Evan Janakievski or Smile Khatri to review drawing if not done already

  • No labels