Attendance
In person | Online |
---|---|
General Updates
New faculty advisor: Brandon DeHart
Manager of the RoboHub, and will be attending some of our competition syncs this term to provide technical guidance.
Derek Wright was too busy
Last flight test
Speed/Range/Obstacle avoidance
Did not test everything due to rain but some retune was done (needs more work)
Autonomy data collected
buck converter for RPi usb c port broke off
was untested
known issue with these board with respect to poor solder
Next flight test
This Saturday
Testing video system, relay system, geological system, tuning
Leave bay at 10am
https://discord.com/channels/776618956638388305/1289257239957340221
2024-10-05 Pegasus 2 & Houston - Flight Tests - WARG (atlassian.net)
Hotplate ordered
Toaster oven not acquired yet - if you would like to help let me know
Get the electronsite role if on site - reach out to Ryan Scomazzon if you have issues
Reminders
Don’t forget to fill out the team roster: https://forms.office.com/r/ka0MJHJQ9D
Check out Conops for AEAC! Get involved in comp syncs for discussion https://www.aerialevolution.ca/annual-student-competition/
Competition Architecture Sync: weekly Thursday at 8 PM in E5 2103.
Fixed Wing Architecture Sync is on every other Wednesday at 8 PM in E5 2103
Not this week
Lack of pilots next term - Reach out if off stream and interested
If you are on a project and can use some help, reach out
Meeting Times
Board bring up Status
Please update test plans/board documentation!
Board Name | status | blockers | plan going forward |
---|---|---|---|
Tracking antenna | assembled SMT components on 2 boards |
| continue debugging and document process |
ESC CAN | Assembled SMT components on all 5 boards Resoldered some components that did not reflow well/had some minor issues (mainly the STM32) Validated continuity + potential shorts, no perceivable issues so far Added BM06 Connectors EFS did some initial testing with the board (with more to come) and MCU is talking and working at the moment. | Waiting for EFS to do comprehensive test to ensure full functionality - needed for all 5 boards with only one being tested currently | Support EFS with anything needed/required on EE side of things |
LED Lighting REV3 | Assembled 1 side (MCU + CAN circuitry) Planning to do cleanup on STM32s during work session on Wednesday (writing this on Tuesday) | Need NEOPIXELS to come in for the other side of the board | Wait for NEOPIXELS to come in ~2 weeks then assemble the other side |
6S Servo Module | Planning on assembling during Wednesday work session - components sorted and ready to go |
Bring-up Tasks
In order of priority.
CAN DSHOT Controller
Tracking Ant Controller
PRIORITY ASAP
EFS person bust so we have bought a little time
Issue with buck IC
Maybe a short?
More testing today, feel free to come!
RPi Interface Rev B
2 boards assembled and tested
Daniel Puratich for details
Peggy 2 Lighting Board Rev 3
validate CAN circuit with CAN DSHOT Controller before assembling this
let’s assemble the bottom side this weekend?
other side need to wait for LCSC order
Daniel will participate in session for sure but would be nice if someone here to PM
Single Servo Module
for fixed wing, assemble before midterms
6S Servo Module
for fixed wing, assemble before midterms
Saw small power trace in schematic, tested and it seems fine. Might be worth another rev?
Can bring up with what we have
12S Servo Module - Electrical - WARG (atlassian.net)
On hold to focus on comp critical Peggy 2 tasks.
Peggy 2/Comp Updates
Jerry Tian For Peggy 2
Tracking antenna discussed above
Integrated Monitoring and Command Station Requirements (IMACS) - SysInt - WARG (atlassian.net)
Nathan Green Do you wanna talk about this a bit?
IR filters don’t really work
Auto looking for new solution
Detect heat?
Come to comp sync
Fixed Wing Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)
Reminder: Our newest program
First arch sync of the term last week 2024-09-25 Fixed Wing Arch Sync - Meetings - WARG (atlassian.net)
Timeline: Finished end of term
Mech is cooking, see minutes
The below boards should be included
6S servo module
would be worth rolling out an updated rev if we can to fix a minor issue
Single Servo Driver
should be good, needs assembly.
6S power module
highest risk
lowest necessity
Bootcamp Updates
General Tasks
In order of priority. These are the active design projects.
RPi Interface Rev C - Electrical - WARG (atlassian.net)
Daniel Puratich Project Manager, Principle Hardware Engineer
Siddharth Muralikrishnan Ahmed Osman Anthony Lazar Anthony Luo
LTE Breakout - Electrical - WARG (atlassian.net)
Canceled, now part of RPi Interface Rev C - Electrical - WARG (atlassian.net)
green tasks need to be done → need a lot of new components for this board, anyone is welcome to take them, but I actually need these done
12V -> 5V @ 4A Buck Converter + ELRS Board - Electrical - WARG (atlassian.net)
Kenny NaEngineer
24V->5V @ 5 A Buck Converter Board - Electrical - WARG (atlassian.net)
Schematic is under review by Kevin
Placement almost completed
Robert TangEngineer
Kevin Li PM
Unified Video System - Electrical - WARG (atlassian.net)
Tom Chiu Individual Contributor
Layout revamped
New stackup will be
L1 - SIG/PWR
L2 - 2 signal traces, but otherwise, all GND
L3 - Uninterrupted GND
L4- SIG/PWR
Rerouted all signal traces on top and bottom layers with many via transitions. 2 signal traces remain on L2
I tried to ensure that the 2 traces on L2 did not lose gnd reference signal traces do not lose reference.
Removed 2 decoupling caps on the buck to save space.
Sourced a smaller linear regulator for the 12V-5V step down to save space as the current one is overkill based on the required power draw from it.
Please review whenever possible!
Worked with Jerry to understand the existing VTX system. Helped a bit with installation and creating the harness for PWM signal from pixhawk to lumenier switch board.
12S ESC - Electrical - WARG (atlassian.net)
Ethan Abraham Individual Contributor
Schematic nearly complete. Need to change MCU pinout to abide by AM32 hardware groups
Looking for a somewhat experienced EE to handle/help me with layout
ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)
Nolan Haines Individual Contributor
Pegasus wiring documentation
Potential new project: Standard connectors fixed wing
VBat, CAN, 5V in one connector
Easily have everything together so it is easy to remove parts
Potential new project: Test Automation
Needs Assessment (comparing to the manual test procedure we have rn):
1. characterize our custom buck converter’s performance.
2. understand our designs more, help ee members learn
Load transient test is helpful on identifying issues if downstream board is brownout during flight test
Knowing efficiency of the bucks
3. efs running out of work to do
Action Items
This section is here for completeness. If a new task is assigned in a meeting, it will be added here.