Helios M2 Payload Bay
Big Project | Project | Project Manager |
|---|---|---|
Helios M2 | Payload Bay | Isaac Jun-Jie Lam |
Task Description
Research and Brainstorm how frame and fuselage will be made for Helios M2. After decisions are made, this doc can also be used for design decision doc.
Constraints
Constraints | Written By | Append Date |
|---|---|---|
Payload bay to body mounting | Isaac Jun-Jie Lam | Sep 8, 2026 |
Door hinge mechanism | Isaac Jun-Jie Lam | Sep 8, 2026 |
Internal payload mounting pattern | Isaac Jun-Jie Lam | Sep 8, 2026 |
Internal payload bay structure | Isaac Jun-Jie Lam | Sep 8, 2026 |
Assignees
Assignee | Asana Task | Date |
|---|---|---|
@ assignee | link to asana task assigned | Date assigned |
Task Progression/Updates
Author: Isaac Jun-Jie Lam updating Date: Sep 8, 2026
The payload bay is a central part of the fixed wing program and will enable the aircraft to perform tasks during competition.
In the past, we have only used hexacopter with exterior mounted payloads like this water tank
For reference, the payload bay sizing for Helios M2/M3 was determined to have the ability to contain this exact payload shown above .
So what needs to be done for the current payload bay…
Above is the current state of the payload bay, very barebones with just the general geometry in place. There are 4 main subcomponents to the payload bay that need to be worked on:
The payload bay door hinge and deployment mechanisms
The payload component mounting pattern and structure
The actual structure of the payload bay to support the opening mechanisms, mounting holes pattern and shape rigidity also needs to be worked on
The mounting from payload bay to actual fuselage body
Each of these components can be worked on independantly but will require some level of coordination in terms of the structural components.
Payload bay door hinge
Main design constraints
Ideally something off the shelf for superior reliability than what we can manufacture ourselves. There are plenty components that have been predesigned for this very purpose.
Hinge mechanism has to allow the doors to either flip open 90 degrees or slide away and sit flush with the rest of the payload bay. In the end, the doors should be mobile enough to move out of the way of the internal payload deployment.
The mechanism should also have the ability to be electrically activated in the future if we need that capability. (using servo motors)
Both doors should have their own hinge assembly, though they should open synchronously using some linkage that syncs the two doors together.
The hinge assembly should also have a way to mount to the payload bay itself, this can be done using locally built up plys of carbon (payload bay is made out of 3-4 plys of carbon) an additional 2-3 plys will be required to prevent delamination depending on loads experienced (will need to be calculated depending on door weight). The hinge mounting should be coordinated with the person working on the payload bay rigidity structure so that the hinge is placed where ribs are located. The hinges can be further reinforced with structural epoxy on top of bolts.
Red - final state
Payload bay internal mounting pattern and structure
Main design constraints
Since the primary goal of the payload bay is to contain and mount deployables during flight, we will need a way to modularly mount components to the internals of the payload bay.
We can take inspiration for valkyrie or prior competition drones that have been used. The 30mm x 30mm bolt patterns on the carbon fiber plates have been a very effective way to mount payloads in the past.
We can do something very similar.
The main constraints for this tasks are to allow payloads to mount to the internals of the bay in a modular manner meaning it can accomodate many different payloads (standard bolt pattern placing is a good way to achieve this)
Have a way for this mounting pattern to seamlessly integrate with the rest of the fuselage structure
Ensure mounting locations are stiff enough so that payload sits securely when mounted.
Payload bay rigidity structures
Main design constraints
This task focuses primarily on the stiffness of the payload bay skin itself.
By taking inspiration by what has been done on the fuselage, the payload bay will lkely need supporting ribs and bulkheads to allow the carbon fiber skin to hold its shape.
This task will also require collaboration with the payload mounting pattern task and hinge door task. Since those components will require mounting into the payload, it is best that the mounting locations for those tasks be incorporated into the structure of the payload bay to ensure the loads generated by those components do not yield the payload bay.
A good place to start for this task is the have a general layout of bulkheads and to give the payload bay its structure with an assumption that there will be compressive loads pointing towards the center of the bay and tensile loads caused by mounting to the rest of the fuselage. The payload bay will generally want to squish in on itself if no bulkheads exist and deform and yield at its mounting location to the rest of the fuselage, if structure can be put into these regions that would prevent failure.
Ensure calculations are done using adequate force assumptions, compressive loads can occur during handling and tensile loads can be assumed based on mass of payload bay (~1kg max).
Payload bay mounting to main fuselage
Main design constraints
This task is essentially finding a way to mount the payload bay to the rest of the fuselage.
Some prior ideas have been to use a linear rail system as shown in the video below.
Using bolts and a keyhole slot (what is shown in the image right above this circled in blue)
The main constraints is to have the payload bay mate with the fuselage in a way that is smooth with little binding or “getting stuck”.
Keep in mind that manufacturing tolerances are not perfect especially with the tools we have so using a linear rail can be challenging if we dont have perfect allignment.
Making sure the mounting strategy can handle peak loads at landing (flight condition that will exert highest g force on payload bay). Assume payload bay ~1kg.
Interface with the current fuselage area which is just a big piece of foam panel right above the payload bay which is a good surface to bolt things into or bond things on.
Ideally the payload bay is installed (slid in from the side) in the same way as the video below.
The container will slide into the guide rails mounted to the inner-sides of the fuselage with the linear carriages fastened in the sides of the storage container (there will be a path cut out in the container to make space for the carriages to slide onto the guide rails) then the container is secured to the fuselage with four twist in spring plungers.
Parts List:
(4x) Twist to lock retractable spring plungers: https://www.mcmaster.com/products/retractable-spring-plungers/knob-grip-retractable-spring-plungers-1~~/spring-plungers-2~plunger-locking-type~twist-to-lock
(2x) Linear guide rail:
https://www.mcmaster.com/products/miniature-linear-railsutm_source=gemini
(4x) Carriage for guide rail
https://www.mcmaster.com/products/miniature-linear-rails
Fasteners, vary on size of guide rail hole chose, They should be large to support the heavy load.
Locknuts for spring plungers