 | Electrical | Lucy | Boards are on their way usb power done pwm header done micro on 4/6 finishing on tuesday
|
| Mech
| Brielle
| Reaserch Vtol, switchblade or other. Material selection is foam (cnccuttable stuff, all else is too hard) 3D printer 75% done! camera case for gopro has been printed ! no progress on grabber, waiting for printed parts
|
 | CV | Ryan | have the gopro Don’t have the Lightbridge (Chris Hajduck mentioned it’s not as great as we think (some latency and stuff)). CV made a roadmap, people should check it out! Does anyone actually read these notes though ? hmmm. If anyone ever comes accross this page, gimme a call, (Anthony, 6473855862) CV simplified the plan a bit, manual control needed for picking up the box. FInalized box detection stuff working on box traversal
|
 | Firmware | Anthony | Nixon finished guts of autolanding, will put under sim once path manager done Path manager almost finished (couple states). Sensor fusion almost done, some documention and finalization. Sahil FreeRtos almost done. Up for review, almost ready for merge. Waiting for hardware. Taxi manager task picked up by Anthony. Mavlink encoder works. Met with Chris, worked out Path manager wind issues and such.
|
 | Admin | Alex | |