2022/10/30 CAD REVIEW 2

Updates to last week’s points:

Placement of pusher prop has a lot of distance from the horizontal stabilizer. Not a ton of space between fuselage and pusher prop, @Emma-Lee Keeping for CFD to make sure this won’t be a problem

Wing modifications well in progress for wire routing and servo harnessing @Megan Spee

Arm disarm is projected is projected to be in the tail @Conall Kingshott or @ ryan (add him to confluence) CAD this to the tail

Vector nav antennas on the wings, aerodynamic pods will be cadded on top of the wings @Megan Spee

No comment on parachutes

Landing gear @Matthew Visser cutouts in the fuselage needed for mounting @Emma-Lee Keeping

avionics compartment, needs to be cadded where it mounts in a removable way @Megan Spee

ESC mounting pods/ wire covers not complete, not started, @Megan Spee

windspeed sensor on wing, @Megan Spee

@Joshua Perry assigning materials to cabin and fuselage

T gusset + motor mounting on assembly done @Vishal Jayakumar

CF fuselage, add holes to the bottom for mounting cameras and landing gear, @Megan Spee

Green light needs mounting ON TOP of the avionics compartment

ventilation (WATERPROOF) on the frontside of the avionics compartment

bolt holes etc for avionics compartment

Rudders: fix up cad, needs to add control surface hinge

 

 

Action items:

  1. manufacturing steps.

  2. CNCing foam

  3. actual wiring (wire length, connections, make electrical do that)