2022/10/30 CAD REVIEW 2
Updates to last week’s points:
Placement of pusher prop has a lot of distance from the horizontal stabilizer. Not a ton of space between fuselage and pusher prop, @Emma-Lee Keeping for CFD to make sure this won’t be a problem
Wing modifications well in progress for wire routing and servo harnessing @Megan Spee
Arm disarm is projected is projected to be in the tail @Conall Kingshott or @ ryan (add him to confluence) CAD this to the tail
Vector nav antennas on the wings, aerodynamic pods will be cadded on top of the wings @Megan Spee
No comment on parachutes
Landing gear @Matthew Visser cutouts in the fuselage needed for mounting @Emma-Lee Keeping
avionics compartment, needs to be cadded where it mounts in a removable way @Megan Spee
ESC mounting pods/ wire covers not complete, not started, @Megan Spee
windspeed sensor on wing, @Megan Spee
@Joshua Perry assigning materials to cabin and fuselage
T gusset + motor mounting on assembly done @Vishal Jayakumar
CF fuselage, add holes to the bottom for mounting cameras and landing gear, @Megan Spee
Green light needs mounting ON TOP of the avionics compartment
ventilation (WATERPROOF) on the frontside of the avionics compartment
bolt holes etc for avionics compartment
Rudders: fix up cad, needs to add control surface hinge
Action items:
manufacturing steps.
CNCing foam
actual wiring (wire length, connections, make electrical do that)