2023-03-20 EE Meeting
General Team Status/Schedule:
Meeting times:
EE Meeting: Monday 8-9 PM E5 2103
EE Work Sessions: Tuesdays 7-8PM E5 2003 (The Bay)
Icarus Sync: Tuesdays 9-10pm E5 2004
ZP3 Sync: Wednesdays 8-9pm E5 2103
General: Thursdays 8-9 PM E7 5343
Project Updates
Attendance:
In Person | Online |
---|---|
|
|
Updates this week!
Cornflakes
March 18 Flight Test (Attendees: Daniel, Ethan, Michael, Nolan)
Flight Test Documentation: Mar 18, 2023 Flight Test
EE Specific Notes:
Servo (same one we had issues with) failed in cold
Cheap batteries underperformed and we are looking into returning them
See documentation for the other notes
ICARUS Program
Wiring Diagram (Michael, Farris, Rayyan)
Rayyan:
Listed out components needed to for power requirement arch and have questions regarding some devices/components
Will look into calculations and values needed to be made to find nominal and max values
May require an updated block diagram to get better understanding of connections to make more accurate calculations
Farris: Not much done this week
Planning on getting rough mechanical drawing of competition rover with available mounting points, as well as any already defined mounting locations for devices labelled
Change of plans: Will work with @Rayyan Mahmood to divide up the components and figure out power sourcing/loading
Michael:
Listed out most components that were missing in the drawio based on system architecture confluence.
Added those components as nodes in the drawio diagram and started some connections.
ZeroPilot Program
Assembly & Testing (Ethan)
Use work session tomorrow for some ZP3 assembly
We need to finish the three other PCBAs we have that are mostly done (need interboard connectors)
Soldering more interface boards
Admin
Purchase Orders (Ethan, Daniel)
Getting our 100 dollar Digikey order using EngSoc funds
Daniel & Ethan to decide what else to be included in the order
Michael to add Zener diode
Bootcamp Revamp (Michael, Kevin, Farris)
Kevin: Started working on defining the design concept and relevant theory for the bootcamp challenge
Farris: First draft of schematic-creation portion of bootcamp done (6 - Schematic Creation)
PCBs
24-12,5 Buck (Ethan, Michael, Daniel)
Daniel:
Assembled 1 and it’s working (Issues were recoverable!)
We should order a diode and assemble a bunch at once
Time permitting
12-5 Buck (Nolan)
Fixed polygons, added top overlay VIN/VOUT text, added meme + text on bottom overlay → pushed
To do → lower res picture of kid named finger; review from someone if needed?
Board is basically done I think
4S 30A Motor Controller (Muhammad)
Won’t be able to make today’s meeting
Working through suggestions from the review
Will try to ramp up the pace starting Thursday (including decision and rationale for input capacitance)
5-24V Boost (Steven)
Finished up footprint for micro USB
work on layout this week
12S Servo Module (Stanley, Michael, Rayyan)
Fixed Buck IC symbol
Added some components to the library
Ethan went through finding the existing symbols and footprints in Altium with me
Going to finish adding all the components this week, and hopefully finish the Buck schematic as well
Bootcamper Progress Updates
Tom: Have voltage sense and buck converted section left
Max: RPP completed, currently working on current sense
Jack: Bootcamp review with Michael. Completed!! Waiting for task assignment
Elion: Bootcamp review with Michael. Completed!! Waiting for task assignment
William: Bootcamp review with Michael. Completed!! Waiting for task assignment