2024-03-19 Mechanical Meeting

Date

Mar 19, 2024

Attendance

Team Announcements

Item

Presenter

Notes

Item

Presenter

Notes

Next Flight Test

@Nathan Green

  • Pegasus will be flown on the 12th to test the video system after rewiring

  • Checking for interference issues

  • Comp. sim 1

  • Need Barbie dolls and cargo in cabin for comp. sim 1 (cabin is not finished not sure)

Comp Attendance

@Alison Thompson

  • If you are interested in attending comp, even if you are still waiting on co-op placement that’s okay! Fill it out anyway

  • Comp roster will be chosen soon, details on process to come

  • https://forms.gle/1RKeZdagaXZSUgN29

Announcements

@Alison Thompson

  • 1st in phase 1 paper! Congrats everyone who helped out :D.

  • New Tech Director: Welcome @Nathan Green as tech director!

  • Comp Pilots: @Nathan Green and @Yuchen Lin competition pilots for this years AEAC competition.

Work Session

@Alison Thompson

  • I won’t be around this weekend, so can’t lead a work session

  • 1

Updates

Item

Presenter

Notes

Item

Presenter

Notes

Pegasus 2

@Alison Thompson

  • New landing gear prototype CAD reviewed, small comment then time for drawing

  • @Smile Khatri has worked hard on the arm connectors

    • I looked at these today

    • IMO 3 fit well, one is too loose (I labeled the loose one)

    • I would like to see that one remade

    • Need to get these to machinist to CNC ASAP, can the 4th one be remade by end of week?

  • As soon as new landing gear prototype is tested and we’re happy with it we can start cutting and drilling arm and leg tubes

  • Prototype will be made as soon as stock comes in

  • Comp ones made as soon as we’re happy with prototype

Antenna Tracker

@Arjun Mandair

Current State

image-20240319-215929.png
  • Reviewed @Justin Liu drawings and CAD, as well as double checked dimensions on gearbox. Great work!

    • Not too familiar with reviewing drawings, but seems good to me. Any thoughts Mech Leads?

image-20240319-220354.png

 

Next Steps

  • Looking to order ASAP and cut ASAP to machine on Saturday.

  • @Justin Liu Work looks great keep it up! Once machined and assembled, I will mark your Asana Task as done

    • Should be good to take other tasks if you’d like. However, if I need changes, will notify you. Should be small changes going forward.

Cargo Compartment

@Evan Janakievski

@Sohee Yoon

  • New aeropanels are taking shape, sims were done for different cabin shapes.

  • First iteration of the second version is done. Need to make some adjustments to the mounts and think about how to allow room for error since it won't be the exact shape we design it to be.

Comments from @Alison Thompson :

  • Reworked timelines, hard deadline of March 27th for design to be finalized and reviewed

  • Make panels on March 29th or 30th

Houston Landing Gear

@Smile Khatri

  • Landing gear re-design has been reviewed and stock material ordered → should be in later this week

  • Must be manufactured and assembled onto the drone by March 30 (almost 2 weeks time)

  • Can be manufactured this weekend.

Pegasus Carrying Jig

@Evan Janakievski

  • Parts are ready for pick up. Manufacturing can start on this

New Tasks

 

 

Next Meeting