2024-10-10 Mechanical Meeting Minutes

Date

Oct 10, 2024

Attendance

@Smile Khatri

@Alison Thompson

@Calum Chisholm

@Evan Janakievski

@Thushanth Parameswaran

@Georgia Vachon Westerlund

@Nathan Green

@Nathaniel Li

@Sohee Yoon

@Agapa Goombs

@Justin Liu

@Ben Lovegrove

@Camilo Artigas Alos

@Keegan Jeewan

@Arnav Gupta

Team Announcements

Item

Presenter

Notes

Item

Presenter

Notes

Next Flight Test

@Smile Khatri

Next Work Session

@Smile Khatri

  • No work session this Saturday, or right after reading week

  • No mech meetings the next 2 weeks

  • @Smile Khatri will be in the Bay after the flight test if you have questions

Other Announcements

@Alison Thompson

Updates

Item

Presenter

Notes

Item

Presenter

Notes

Comp Design

@Alison Thompson

@Megan Spee perception of fittings assembly:

IMG_0745.jpg
IMG_0746.jpg

topmost 4 components referenced in discord thread.

  • @Jievan Tapajna @Victor Sun pump + valve updates?

  • @Camilo Artigas Alos landing gear updates?

    • The base design is done, currently looking into implementing anti-tipping bars and create two different configurations for each approach of water retrieval.

  • @Agapa Goombs clamping block updates?

IMACS

@Smile Khatri

  • Monitor mount is done. Everything has arrived @Calum Chisholm

    • May need to drill larger holes for the acrylic. To be tested tomorrow

Eclipse (Fixed-Wing) Airframe

@Evan Janakievski

  • Following fixed-wing sync discussion yesterday, might make adjustments to the airframe of Eclipse

    • POR is to use one battery now, can decrease size of the bottom plate or even get rid of it (this would require it being underneath pixhawk not sure about EMI issues)

      • No EMI issues w/ mounting Pixhawk above the battery confirmed by Daniel - Smile

  • Tail boom support first version was made. Have some adjustments for @Sam Wong

    • Can probably use just one space now that we are only aiming for one battery. And if we switch to two batteries can make adjustments as necessary

  • Drawings by @Justin Liu

    • Good start, can we schedule a call to go over these together following midterms?

      • Discussed in person will meet after midterms

Tracking Antenna

@Sohee Yoon

Fuselage

@Sohee Yoon

  • @Calum Chisholm any new updates on the fuselage design? Fuselage Design

    • Once that is done, let @Victor Sunknow so that he can adjust the frame

    • Deadline: Does next week sound reasonable?

Wings

@Nathaniel Li

  • @Sohee Yoon great work on the FEA study!

    • Didn’t fracture even at theoretical max lift force during takeoff

    • Possible fracture at higher lift forces occur at the cutout beside the spar cutout and closer to TE

      • This shouldn’t be a concern unless we go past our targeted velocity of 30m/s and undergo max lift

  • Reviewing aileron design options

  • Start manufacturing after midterms

  • New tasks:

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=e766ae15-11b0-4638-8dd8-b3ec20ca1e46

Empennage

@Thushanth Parameswaran

  • Design completion by end of October

  • POR to use 2 rods for the spar for the HS and 2 for the VS

  • Going with tapered VS.

  • Haven’t updated the design below for the elevators but there won’t be overlap

  • 3D print control surfaces using LW PLA?

  • Spacers for ribs assembly

Landing Gear

@Ben Lovegrove

Fixed wing landing gear

  • Front landing gear is done and cheese holes are added

  • Rear landing gear CAD is nearly done

    • I’m currently using the HS - 311 Servo that we already have

    • I also added the CAD for the part to COTS PDM file

    • I’m going to be doing sims soon

 

  • Possible to change front landing gear to 14 GA and run sims to see if it’s valid? Max Thickness we can bend, wanna see if we could go w/ this option - Smile

 

Tasks

@Smile Khatri

Next Meeting