2024-11-20 Electrical Meeting

Attendance

In person

Online

In person

Online

@Ryan Scomazzon

@Meghan Dang

@Tim Gu

@Daniel Puratich

@Andrew Chai

@Shawn Yang

@Kenny Na

@Jerry Tian

@Robert Tang

General Updates

Reminders

  • Please clean up after yourself

  • Get the electronsite role if on site - reach out to @Ryan Scomazzon if you have issues

  • Check out Conops for AEAC! Get involved in comp syncs for discussion National Annual UAS Student Competition - Aerial Evolution Association of Canada

  • If you are on a project and can use some help, reach out

  • Don’t forget to fill out the team roster: Microsoft Forms

  • Missing GPS

    • RIP - Gone forever likely

    • probably gonna order

      image-20241009-040607.png

Board bring up Status

Please update test plans/board documentation!

  • Board Bringup Priority List:

    1. Water Controller Rev 1 - this term

    2. LED controller rev 4 - this term

    3. Tracking Antenna Rev 2

    4. 6S Servo module rev 2

    5. Unified VTX

    6. Water Controller Rev 2

    7. Sensor Cluster

    8. Programming Connector Adapter - this term

      1. assemble w/ water controller bc both small boards

 

Board Name

status

blockers

plan going forward

Board Name

status

blockers

plan going forward

GPS Breakout

  • Alternative GPS selected

 

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • electrical validation done. need firmware. 3x boards all ready to go right now

 

6s Power Module

  • Waiting for Diodes to come in

  • Power rails working

  • Still waiting for Firmware

 

Water controller

  • not started

  • @Shawn Yang should make a test plan for this to make this process faster

  • boards and components need to come in

 

Peggy 2/Comp Updates

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

    • 6S servo module rev 2 - On midterm order - assembly likely next term

    • Single Servo Driver - waiting on EFS

    • 6S power module - in validation @Andrew Chai for details

      • High current test

      • POR for first flight of eclipse next term.

    • CAN Integration 2025

General Tasks

In order of priority. These are the active design projects.

 

12V Input to 65W USB-PD Source - Electrical - WARG

  • @Ian Van Den Steen

 

12V to 24V Boost Groundside Converter - Electrical - WARG

  • @Tim Gu

water controller rev 2

  • @Shawn Yang add link for new doc and any progress

https://uwarg-docs.atlassian.net/wiki/spaces/EL/pages/2843967490

  • completed component selection of both the shunt resistor for current sense as well as LDO IC selection.

  • plans to have such done soon in the coming days

Action Items

  • Try to get submarine game at social - was ryan chans

  • Throw et in discord?

  • Make channel for new boards

  • Reach out to shawn about water controller