General Updates

  • Last flight test

  • Next Flight Test - Nov 23rd

  • Final Flight Test of the term - Dec 14th

    • water controller

      • we need this assembled and validated by then!

    • PULL UP!!

  • NEW PCB SPONSOR ?????

    • PCBX

    • Covering PCB & PCBA

    • Ryan looking into logistics

    • reached out to warg for free PCBs and PCBAs (WARG is big time)

    • Tryna see what they are willing to cover

  • Midterm board order

  • EE Work session

    • Todays (Wed Nov 20th)

      • creating harnessing and wiring RPi on Peggy 2

    • Fridayโ€™s (Nov 22th)

      • if boards come in (likely will), some assembly

        • water controller

        • programming header

      • Open to suggestion, if not, probably donโ€™t need this work sesh

        • 12s Servo Debugging - bad soldering potentially

  • EE Social

    • was really fun! ty everyone for coming out

    • If you wanna help with costs, you can ET ryanscomazzon@gmail.com

      • You're not expected to pay but can if you want

      • For reference the soup was for ~$52 total for ingredients, you can give whatever you think is fair

      • Beer is on me, donโ€™t bother about paying for that

      • I do not have auto deposit on and will decline if you try to be too generous ๐Ÿ˜ˆ

  • Team Social with WATO and Rocketry

    • This Friday!!!!

    • Gingerbread house competition, will be super hype

    • will have some board games too

    • i (meghan) might bring cookiesโ€ฆ

  • We ordered MERCH!

    • image-20241120-214518.png
    • Jackets next term!

  • Comp/Eclipse sync

    • Eclipse sync tonight @ 8pm in E5-2103

    • Comp sync tmrw night (Thursday) @ 8pm in E5-2103

Reminders

  • Please clean up after yourself

  • Get the electronsite role if on site - reach out to @Ryan Scomazzon if you have issues

  • Check out Conops for AEAC! Get involved in comp syncs for discussion https://www.aerialevolution.ca/annual-student-competition/

  • If you are on a project and can use some help, reach out

  • Donโ€™t forget to fill out the team roster: Microsoft Forms

  • Missing GPS

    • RIP - Gone forever likely

    • probably gonna order

      image-20241009-040607.png

Board bring up Status

Please update test plans/board documentation!

  • Board Bringup Priority List:

    1. Water Controller Rev 1 - this term

    2. LED controller rev 4 - this term

    3. Tracking Antenna Rev 2

    4. 6S Servo module rev 2

    5. Unified VTX

    6. Water Controller Rev 2

    7. Sensor Cluster

    8. Programming Connector Adapter - this term

      1. assemble w/ water controller bc both small boards

ย 

Board Name

status

blockers

plan going forward

Board Name

status

blockers

plan going forward

GPS Breakout

  • Alternative GPS selected

ย 

Single Servo Driver

  • electrical validation done. need firmware. 3x boards all ready to go right now

ย 

6s Power Module

  • Waiting for Diodes to come in

  • Power rails working

  • Still waiting for Firmware

ย 

Water controller

  • not started

  • @Shawn Yang should make a test plan for this to make this process faster

  • boards and components need to come in

ย 

Peggy 2/Comp Updates

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

    • 6S servo module rev 2 - On midterm order - assembly likely next term

    • Single Servo Driver - waiting on EFS

    • 6S power module - in validation @Andrew Chai for details

      • High current test

      • POR for first flight of eclipse next term.

    • CAN Integration 2025

General Tasks

In order of priority. These are the active design projects.

  • RPi Interface Rev C - Electrical - WARG (atlassian.net)

    • @Daniel Puratich Project Manager, Principle Hardware Engineer

    • @Siddharth Muralikrishnan @Anthony Lazar @Anthony Luo @Shawn Yang @Kenny Na

    • End of term target

    • halfway through routing

    • on track - end of term

    • SIM card holder out of stock - find alternatives (Jerry goated)

  • 12S ESC - Electrical - WARG (atlassian.net)

    • @Ethan Abraham& @Andrew Chai

    • POR for FETs has been decided - keep with current FETs and add a heatsink to cool them

    • Placement is basically done, this week will move to routing after Ethanโ€™s review

    • End of term plan

  • ELRS Redundant Diversity RX - Electrical - WARG (atlassian.net)

    • @Nolan Haines Individual Contributor

    • ย 

  • 12S Pre-Charge Controller Module

    • @Robert Tang , @Kevin Li

    • in schem stage

    • implementing RPP

    • starting prelim placement for board size

  • 3S ESC

    • @Kenny Na, PM @Daniel Puratich

    • Component selection stage

    • Stalled in order to complete RPi Interface Rev. C first

  • Fixed wing connector research (VBat, CAN, 5V)

    • @Ryan Scomazzon

    • No progress - feel free to help out

    • Ryan saw a cool one at work

  • Fixed wing copper bird ? @Ryan Scomazzon

    • Reach out if you wanna PM eclipse next term and are onsite

  • ELRS Gemini Testing/Rev 2

    • @Ahmed Osman

ย 

12V Input to 65W USB-PD Source - Electrical - WARG

  • @Ian Van Den Steen

ย 

12V to 24V Boost Groundside Converter - Electrical - WARG

  • @Tim Gu

water controller rev 2

  • @Shawn Yang add link for new doc and any progress

Water System Controller rev 2

  • completed component selection of both the shunt resistor for current sense as well as LDO IC selection.

  • plans to have such done soon in the coming days

Action Items

  • Try to get submarine game at social - was ryan chans

  • Throw et in discord?

  • Make channel for new boards

  • Reach out to shawn about water controller