Mechanical

Notes on manufacturing status.

 

Airframe

  • manufacturing work is done

  • no updates on fabrication side of things

  • landing gear won’t be on airframe for easy wiring

  • Will be assembled when spar is deburred

    • When would EE like it ready for harnessing?

      • For Feb 11 work session

Wing

  • Spar had a wiring slot added to it, just needs to be deburred

  • will electrical tape the wires

landing gear

  • landing gear adapter arrived and safely stored in the red toolchest

  • Has to be assembled and mounted to the air frame

  • waiting on one part to be water jet for rear landing gear

    • waiting on this order, around 1 week

  • front landing gear assembled

Empennage

  • horizontal and vertical stabilizers complete

  • control surfaces printed, and linkages made as well

  • Only left to glue the vertical stabilizer to the horizontal stabilizer and test the servos for control surface deflection

    • last step

  • Tested the control surface deflection, seems all good https://discord.com/channels/776618956638388305/1288305741932924973/1336472328229490698

    • plan to done by this thursday

  •  

    image-20250204-230820.png

     

Servo temperature issue

 

 

Everything Mech is in last drawer in the red toolbox.

flagpoles are on 1st row on mech shelf

Avionics/EE updates

  • Harness Fixed Wing 2025 | Maiden Flight Electronics System Diagram

    • Will follow up on harness schematic tasks

  • 6s Servo Module

    • efs

      • code is functional

      • quality of life testing blocked by ee, not enough hardware

    • ee

      • need 1 good board for eclipse

      • bringing up rev 2, 1 board assembly is done, validation this Saturday

  • 6s power module (EFS)

    • efs

      • progress is happening,

      • MVP aim to be done post midterm, around march 1st

      • MVP functionalities:

        • battery voltage sensing

        • battery current sensing

    • ee

      • no progress so far

  • Single servo driver

    • ee

      • needs 2

      • found 1 good board, need to make another board

      • ee working on the board bringup list, will follow up next week

    • efs

      • code is functional

      • can fly

  • 24-5V buck

    • ee

      • is this ready to fly (fully validated) ?

      • not sure, @Kenny Na is confident board is fully validated, optional board, probably won’t pursue for maiden flight

  • EE connectors are ordered, don’t think it arrived yet.

  • Electronic component inventory status:

    • where they are @Nathan Green

 

Pilot Training - Foam Plane

  • Crashed right after the throw ggs

  • 2025-2-2 Autonomy + Foam Plane Flight test | Flight test debrief report

  • ee to order servos that are rated for -30C https://ca.robotshop.com/products/dfrobot-micro-servo-motor

  • we used same prop as houston, see data highlighted in red below

    image-20250203-051500.png

     

  • should we calibrate ESC beforehand? if so how to calibrate?

 

  • Lesson learned:

    • not enough thrust, next flight we can use smaller 3s battery, 2 props to save weight and generate more thrust

    • do outside full prop test

  • next foam plane flight test:

    • buy off the shelf foam plane

    • takes around 2 weeks to arrive, probably during reading week

    • should be able to house px6 and other electronics.

  • Foam plane program

    • request funding for engsoc and weef and mef

    • help people learn plane control

 

 

Timeline

  • Eclipse Strapdown Test: March 1st/2nd

  • Eclipse Maiden Flight Test: March 8th/9th

  • another foam plane?