Attendance
Mechanical
Weight Concerns
Evan
Just under 4 kg (~3.8 kg including batteries off the top of my head) without the empennage, rear landing gear, and all electronics (servos etc)
It is possible to shave some weight off the airframe by shrinking the size of the plates down as the bottom one is not only being used for batteries
Just need some extra space to move batteries to properly align center of gravity at 1/3 of the airfoil
If weight becomes major issues, can remove one battery until other weight saving efforts could be made
Wing Manufacturing Concerns
Evan
Depending on challenge of manufacturing the wings, crashes could be very detrimental in having to do repairs
Will learn more about MonoKote as we use it more, which will give us a greater understanding of the positives and negatives of this method
WatArrow already did a lot of the trial and error and shifted to foam and carbon fiber tube (from meeting Nathaniel Li had with them)
If we aren’t able to successfully manufacture the wings using current method, do we want a backup option that could be done?
Avionics
Required Boards
6S Servo Module Status
Single Servo Driver Status
Optional Boards Status
6S Power Module
Redundant Pixhawk Power Supply
Firmware Status
Have we successfully flashed things with AP_PERIPH?
Will the eclipse boards be faced with the PB0 challenges as well?
Firmware needs to request changes now if they’re needed.
Timeline
Are we doing a copper bird as a way to pre-emptively start on wiring and Pixhawk Configuration?
Are we too busy with competition stuff to continue the current eclipse timelines?
Manufacturing and ground testing timeline thoguhts?
Review what I have in Asana.
Piloting
Need to select a pilot and start training regiment
Simulator time initially
foam planes with no autopilot that work well should be built
practice line of sight flying mostly
Daniel Puratich has de-assigned pilot for maiden role because POR seems to be maiden flight during W25 when I will be offsite.
what do we want to do with the fixed wing before comp 2025?
Maybe a bit early to be asking the question, but I guess if we're pushing to get maiden done is the reason just to ensure we can all focus on peggy 2 leading up to comp or is it because we wanna try to make more changes and improvements on it before vtol stuff?
I am really hoping with the fixed wing we can discover most of the problems/challenges with it just being on the ground.
Airfoil will be the big one we cant test on the ground i guess eh?
Maiden flight should prolly include an autotune imo. Integrating autonomy system seems excessive.
All electronics are for sure ground testable (hence me pushing for a copper bird type setup now).
The strapdown test will be nice here to prove out the power train