Big Project

Project

Project Manager

Pegasus

EP2 Case

Smile Khatri

Task Description

Currently, our EP2 board (which establishes ELRS connection to allow remote control of the drone) is taped to the top x-frame plate. We want a better way to secure EP2.

The task is to design an enclosure which will shield EP2 and secure it properly onto the x-frame plate.

EP2.jpg

Constraints

Constraints

Written By

Append Date

ELRS antennas must be exposed

Smile Khatri

June 12, 2024

Hole/slot for power cable

Smile Khatri

June 12, 2024

Passive cooling by airflow

Smile Khatri

June 16, 2024

Mounts to a 30 x 30 grid pattern

Relevant Contacts

Subteam

Contact

Contact Description

Tech Director

Nathan Green

Answer questions regarding EP2 and add constraints if needed

Assignees

Assignee

Asana Task

Date

Pranav Bommireddipalli

link to asana task assigned

Date assigned

Task Progression/Updates

Author: Pranav Bommireddipalli Date: 2024/06/25

Created Initial Design

image-20240626-005635.png