Meeting Scope
Track state of new Cornflakes airframe post previous flight test
Identify and update deliverables, owners for each subteam for flight test next weekend
Look into long-term flight test planning (general flow of what we would like to ideally test)
Other Concerns
Track state of Icarus frame and when it will be ready for wiring
Concerns regarding onsite engineering bandwidth available re EE and EFS to wire and harness the drone
Lessened availability for flight test this weekend due to Easter and long weekend
Flight Test Outlook
Date | Note |
---|---|
April 8th |
|
April 9th |
|
April 16th |
|
April 22nd | Comp flightline (if possible) run through |
April 29th | 1 week before comp - full systems check & second full comp flightline run through |
April 8/9th
Subteam | Tasks (replace these w/asana links when you can) | Owner |
---|---|---|
Mechanical | Cornflakes modification for better propeller airflow | |
Electrical | Cornflakes Wiring modifications as required by system Icarus Wiring: https://app.asana.com/0/1203349931374647/1204285821170041 | |
Sysint | End-to-end testing of system | |
Logistics | Logistics
|
Competition Frame (Icarus Aircraft)
Component | Tasks (replace these w/asana links when you can) | Owner |
---|---|---|
Mechanical | Update re latest date for readiness:
| |
Electrical | Updates:
|
icarus esc case reqs - APD ESCs, all (on cornflakes rn)
Cornflakes ESCs - Flycolor X-cross + hobbywing for push motor.
Alison Thompson ? measure out second cabin spar and add it to the cad
Anthony Luo to give prioritized list of sensors & peripherals to mech 4 mounting.
🔥
exams april 13 - 24th
lands over the April 16 CS proposed flight test
co-ops end on 28th ish
want to run a flight test with only comp attendees - with the 5 flightline people decided - April 21st?