Meeting overview
Meeting to discuss state of Competition Aircraft big quad.
Timeline recap
Integration recap
EE Clarity
🫂 Attendance
🗒️ The Weekly Recap
✈️ Flight Tests:
Autotune works. well.
📦 New arrivals
✅ Open action items
Conall Kingshott Composites stuff never properly setup, not a problem that we had not given to him, Graeme figuring everything out and then letting us know. Composite manufacturing in the next two weeks.
#electrical: Crimps, connectors, housings, signal analyzers, etc.
📝 Meeting minutes
Frame Updates 🚁
MECHANICAL
Composites in the next two weeks, before midsun gets it in (midsuns stuff is massive and takes a while)
Try and get as many people in the room as possible.
Frame updates
Starting on landing gear printsMCMaster Carr order for standoff stuff & miscellaneous items.Talking to Les (machinist). Will likely have to do a lot of this ourselves and then send it off to him to finish (battlebots causing issues).
Sensor Updates 📏
RTK GPS? Has antenna and control box.One M9N, one RTK.Mechanically identical, mounting pattern is the same.will remain on posts (similar to vanny, except further).
RF updates 🌐
Need notch filters? 5W video very much stepping on other freqs? not sure…. currently investigatingCould get SDRPlays. (RSP1A → to be acquired)
Motor 3-phase connectors ✅
MECHANICAL ELECTRICAL INTEGRATION
3-phase connectors decided:MT-30for inner-hub-to-tube connector3.5mm Bulletfor end of tube - motor connector.
Battery PDB Distribution
ELECTRICAL
How are batteries going to be arranged in series/parallel?Scuffed diagram that needs explanation of potential implementation for three 12S batteries
How will our board support this layout?Thoughts:2 PM02D’s (2 banks of batteries), parallel after. Potentially on either side of the battery.Junction point closer to the edge of the board (away from the pixhawk).
Airside Electrical Layout
ELECTRICAL MECHANICAL INTEGRATION
Where each component goes needs to be added to the architecture document.Need selection of proper wire gauges, types, etc.For Battery connections, 8 AWG can be used to handle 75A continuous (maybe a little lower if stranded)Stranded likely needed in order to have the required flexibilityTwo power modules in parallel, two banks of batteries in parallel.
For motor connections, each motor draws around 15A (determined when discussing MT-30s)14 AWG wire (24A) should be enough for ESC connections to PDB
Wire gauge for sensorsCrimpers