Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 9 Current »

Date

Attendance

Smile Khatri

Alison Thompson

Thushanth Parameswaran

Smile Khatri

Evan Janakievski

Shawn Henry Dragon

Camilo Artigas Alos

Sacha Missaghian

Sam Sayad

Megan Spee

Nathaniel Li

Ben Lovegrove

Jack Doehler

Jievan Tapajna

Sam Wong

Ryan Scomazzon !!!

Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Next Work Session

Alison Thompson

  • Work session this Saturday at 9am

    • We will start with machining spacers for the fixed wing frame

    • Cut CF tube for tank payload

    • Payload assembly

    • Angled landing gear assembly (likely epoxy)

    • Box tube for spars and tail boom

Updates

Item

Presenter

Notes

Comp Design

Alison Thompson

  • Both payloads ready for manufacturing, order has been placed for parts

  • Angled landing gear almost done, finalizing angle and adding stopper to account for unknown exact barrel dimensions

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

  • Updates on manufacturing? What needs to happen this weekend?

    • All parts dropped off at student machine shop as well as E3 machine shop

    • Spacers need to be machined as well as spars

      • Drawings for spacers need a final look over but should be fine, simple lathe task

      • Spars drawings will be completed tomorrow for review, holes were added today for gps mount

Empennage

Thushanth Parameswaran

Eclipse Wings

Nathaniel Li

image-20241114-235047.png
  • If you guys need to, feel free to work on it off-line and send Smile Khatri the CAD to add into PDM

Ground Station

Smile Khatri

Peggy 2 Jig

Victor Sun Shawn Henry Dragon

  • We have the plan we were just waiting for Victor Sun to get PDM working, seeing as that hasn’t happened CAD will be done these next couple days

  • We are going to need new holes cut into the baseplate on either side of each battery for the jig

New tasks

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=41641fcc-42d1-56b5-a9ab-6121246aaae8&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=f94dd797-f6a8-5503-8a0b-cc86c4a2eb13&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809c

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=5b843151-aca6-43bd-8bfc-266b6a19b35e&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055

Mech leadership roles

Smile Khatri

Next Meeting

  • No labels