Meeting Scope

  • Track state of Cornflakes airframe post previous flight test

  • Identify and update deliverables, owners for each subteam for flight test next weekend

  • Look into long-term flight test planning (general flow of what we would like to ideally test)

Other Concerns

  • Track state of Icarus frame and when it will be ready for wiring

  • Concerns regarding onsite engineering bandwidth available re EE and EFS to wire and harness the drone

  • Lessened availability for flight test this weekend due to Easter and long weekend

Flight Test Outlook

Date

Note

April 8th

  • Continue transition validation and testing with new/redesigned system from mechanical

  • Continue remaining tests from previous flight tests (test RTL, etc.)

April 9th

  • Continue previous flight testing plan and complete as best as possible

April 16th

  • Hold for: Icarus Frame testing

  • Test out QR code based upload of waypoints re Task 1 on Houston

  • Plan out full path for waypoints Aidan Bowers (Deactivated) (SysInt’s already made comp-sim plan)

April 22nd

Comp flightline (if possible) run through

April 29th

1 week before comp - full systems check & second full comp flightline run through

April 8/9th

Subteam

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Cornflakes modification for better propeller airflow

Conall Kingshott

Alison Thompson

Electrical

Cornflakes Wiring modifications as required by system

Icarus Wiring: https://app.asana.com/0/1203349931374647/1204285821170041

Nolan Haines

Sysint

End-to-end testing of system

Hamza Ali

Logistics

Logistics

  • ensure vehicles, submit FTR, verify bookings.

  • Submit flight test plan

  • Vehicle logistics

  • Ensure checklists are being followed

  • Fill flight box

Hardy Yu

Competition Frame (Icarus Aircraft)

Component

Tasks (replace these w/asana links when you can)

Owner

Mechanical

Update re latest date for readiness:

  • Best estimate of readiness:

Conall Kingshott

Megan Spee

Electrical

Updates:

  • State of Icarus wiring diagram - Complete by 2-April-2023

  • Questions on power architecture and other follow-up from RFC re last week

  • Information: 2023 System Architecture

  • Develop system block diagram

  • Top-down physical electronics layout

    • Starting stages, working on referencing previous layout proposal

  • SMEs:

Nolan Haines

Michael Botros

icarus esc case reqs - APD ESCs, all (on cornflakes rn)

Cornflakes ESCs - Flycolor X-cross + hobbywing for push motor.

Alison Thompson ? measure out second cabin spar and add it to the cad

Anthony Luo to give prioritized list of sensors & peripherals to mech 4 mounting.

🔥

exams april 13 - 24th

lands over the April 16 CS proposed flight test

co-ops end on 28th ish

(warning) want to run a flight test with only comp attendees - with the 5 flightline people decided - April 21st?