Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Attendance

In person

Online

Ryan Scomazzon

Meghan Dang

General Updates

  • Meghan running this meeting πŸ”₯πŸ”₯

  • LAST MEETING OF THE TERM

    • WE ACTUALLY KILLED IT THIS TERM NICE JOB EVERYONE

    • Ryan Scomazzon To talk a bit looking back on how epic we did

  • Last flight test

  • Next Flight Test - Nov 23rd

  • Final Flight Test of the term - Dec 14th

    • Testing both solutions for task 2 - pump (water controller) and scoop (single servo driver

    • water controller is pending on EE - we need this assembled and validated by then!

    • PULL UP!!

  • Winter 2025 EE Co-op

    • An EE coop would be really epic but we need a mentor to have one!

    • If you wanna be a coop mentor, please reach out to EE leads. It would be really really epic and cool and awesome sauce.

    • EE co-ops have been actually popping off (nice job guys)

    • DEADLINE IS TOMORROW so please reach out now if interested!!!!!!!

      • We would still have to make the job description and get it reviewed so must let us know TN

  • PMs next term

    • We are looking for PMs for next term

    • Going to release a form after finals, please keep an eye out if interested

    • No questions on the form, just submit if interested

    • We will talk individually to everyone who fills it out to see PM role would work and go over expectations.

    • Can be on OR off site.

  • Midterm board order

  • EE Work session

  • AEAC Town Hall #1 happened

  • PCBX Sponsorship Ryan Scomazzon

    • Good news and bad news

    • Good news: Turns out they didn't ghost us, it just got sent to junk

    • Bad news: They are ops of deception and basically used this as a marketing campaign. Their offer for free services was only for the first order and everyone gets this as a new account promotion. They conveniently didn't mention this in their first email.

    • They mentioned something about offering a discount to us for long term cooperation? I sent an email to push for what we can get out of them but I think this is probably a dud

    • Back to looking for a JLC sponsorship, I can use some help with that.

  • Comp/Eclipse sync

    • No eclipse sync

    • Comp sync tmrw night (Thursday) @ 8pm in E5-2103

      • LAST COMP SYNC OF THE TERM

  • Beginning of term order

    • Who wants to be on it?

    • Reasonable timeline?

  • TOASTER OVEN ACQUIRED πŸ”₯πŸ”₯πŸ”₯πŸ”₯πŸ”₯πŸ’ͺ πŸ’ͺ πŸ’ͺ πŸ’ͺ πŸ’ͺ

    • Plz dont store things on top of it or touch the top - it gets hot

    • Dont put food in there because we will be using leaded solder in there which will make your food not something you wanna eat (unless you want cancer)

Reminders

Board bring up Status

Please update test plans/board documentation!

WATER CONTROLLER

Board Name

status

blockers

plan going forward

GPS Breakout

  • Alternative GPS selected

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=e839dcd8-defc-42f1-8280-8e2c21fbeea5

Single Servo Driver

  • electrical validation done. need firmware. 3x boards all ready to go right now

  • Maybe make spares since we are using all we made?

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2752839681?entryId=726878aa-bcb8-4728-9eed-18483cfb5c94

6s Power Module

  • Waiting for Diodes to come in

  • Power rails working

  • Still waiting for Firmware

Β 

Water controller

  • not started

  • Shawn Yang should make a test plan for this to make this process faster

  • boards and components need to come in

Peggy 2/Comp Updates

  • Jerry Tian For Peggy 2

  • Water controller making (prob in more detail above)

  • Comp relevant PCBAs

    • Water controller

    • Water controller Rev 2

    • LED REV 4

    • Tracking antenna controller rev2

    • Unified VTX - descoped from this comp cycle

    • Single servo driver

    • Pi interface rev c

  • Big push now is for Dec 14 flight test

Eclipse Updates - Fixed Wing 2025 - SysInt - WARG (atlassian.net)

  • The below boards should be included

    • 6S servo module rev 2 - On midterm order - assembly likely next term

    • Single Servo Driver - waiting on EFS

    • 6S power module - in validation Andrew Chai for details

      • High current test

      • POR for first flight of eclipse next term.

    • 24-5V buck - redundant power supply

    • Jerry Tian Interested in harness diagrams?

    • Looking for diagrams of where things will be mounted from mech

    • CAN Integration 2025

General Tasks

In order of priority. These are the active design projects.

12V Input to 65W USB-PD Source - Electrical - WARG

12V to 24V Boost Groundside Converter - Electrical - WARG

Water System Controller rev 2 - Electrical - WARG

Action Items

  • No labels