The Good Stuff

  • Vanny flew and competed both days!

  • Team adaptability and willingness to pivot

  • Debriefing and applying feedback in real-time

  • First time competing at an in-person competition!

  • Mini integration meetings + strict timelines at competition

Things I’m hearing a lot:

  • Integration test more

  • Better needs assessment

  • Test earlier and more often

Issue: Controlled Authorization

  • Nearly couldn’t fly at the competition because need an advanced

  • Never set sub-team or team-wide level requirements

  • Need a designated conops reviewer (either a chief pilot or someone else)

  • Resolution: At the start of the term, we go through conops as a team, generate a list of requirements encompassing operational and development needs to compete and assign ownership at that time.

Issue: Flightline

  • No communication during flight initially, wrong tools as we were talking over phone.

  • No roles during flight, no ownership over various aspects of flight

  • No pre-flight briefing

  • Resolution: Purchase radios for communication at flight line, develop pre-flight briefing procedure to assign ownership during flight.

Issue: Timeline

  • Aircraft was 3-4 weeks behind schedule, no integration until competition

  • Waiting for everything to be ready rather than flight testing what we have

  • What held us behind schedule?

    • IMU issue + ZP not ready early enough

    • Last minute switch for PDB

    • Frame rebuild after crash

  • Resolution: Move flight testing to happen at a consistent cadence rather than dependant on subsystems being ready, so we flight test even if no changes have occurred. More aggressive and fixed go/no-go timelines that are communicated better across the team.

Issue: Harnessing

  • We didn’t really think of the wiring in advance, didn’t have cases for boards, being more careful around antennae.

  • No physical layout of boards on drone.

  • More connectors in general.

  • Resolution: Centralized wiring diagram and source of truth for what’s on the aircraft.

Issue: RC Dropout

  • Fresnel effect led to RC dropout at distance

  • Resolution: Mount antennae on a pole to remove antennae from ground, long-term work on a directional antenna. Talk to prof/grad student about how to improve comms.

Issue: VTX/VRX System

  • Resolution: Buy a COTS VTX/VRX System.

Issue: Flight stability

  • Resolution: More robust PID tuning and testing on ZP3 for this. Flight modes to hold drone in place.

Issue: No voltage check

  • Resolution: Build battery monitoring system using existing telemetry links, further battery testing.

Issue: ZP couldn’t even fly

  • Resolution: Don’t have a sufficiently iterative design process, tried to do everything at once instead. Going forward focus on basic and stable flight before going for autopilot.

Issue: EE Slow Bringup

  • Resolution: Not enough iteration and poor allocation of budget meaning boards just weren’t completed.

Issue: Poor material choice for frame

  • Designs weren’t finalized which forced things to be changed on mech

  • Parts weren’t ordered as soon as we knew we needed them.

  • Didn’t iterate and change design enough.

  • Resolution: Finalize designs earlier with better requirements capturing, iterate faster and order parts sooner. Make ease of changing design, ease of assembly/disassembly, high tolerance mechanical design requirements.

Issue: Weight budgeting

  • We never kept or maintained weight budgets at all, a rough ones made, had a lot of downstream issues.

  • FW CV EE never gave lists of what was going on the drone.

  • Resolution: More subteam integration discussions and maintaining weight budgets in advance.

Issue: Sleep deprivation

  • Resolution: Add a slack day, arrive 1 day early to competition always

Issue: CV Software Environment

  • No documentation

  • Little integration testing esp since comms was broken

  • Resolution: Use docker, don’t use QT anymore, top down paydown of technical debt, cv lead owns docs.