Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Confirm everything fits together at the moment

  2. Identify missing pieces and things that are left intentionally empty/ not fitting

    1. Anything that needs further details to progress. Get those details

  3. Identify things that need to be brought up at system architecture

  4. Assign tasks and action items for Week 2

  5. Talk about manufacture and shipping orders

go through each assembly and point out issues/flaws/ etc. take notes on it. Bring it out to main assembly for contextualizing each part.