Info |
---|
Meeting overviewMeeting to discuss state of Competition Aircraft big quad.
|
Table of Contents |
---|
🫂 Attendance
🗒️ The Weekly Recap
✈️ Flight Tests:
Vanny SUCCESSFULLY completed auto-tune
Noticed thrust loss on Motor 3 after Battery Failsafe → Investigation ongoing.
This is (not) expected behaviour.
CV Landing pad detection works.
GPS not tested.
📦 New arrivals
HERE RTK GPS Base stations here.
Carbon Fiber tubes here.
✅ Open action items
@Mech to send EE basic X-frame layout so that EE can come up with wiring diagrams/channels.
@Anni to look at static load testing
Conall Kingshott look at talking to bryan about composites
📝 Meeting minutes
Frame Updates 🚁
Status | ||||
---|---|---|---|---|
|
< insert frame updates here >
Sensor Updates 📏
RTK GPS?
Motor 3-phase connectors ✅
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
3-phase connectors decided:
MT-30 for inner-hub-to-tube connector
3.5mm Bullet for end of tube - motor connector.
Battery PDB Distribution
Status | ||||
---|---|---|---|---|
|
How are batteries going to be arranged in series/parallel?
How will our board support this layout?
Airside Electrical Layout
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Status | ||||
---|---|---|---|---|
|
Where each component goes needs to be added to the architecture document.
Need selection of proper wire gauges, types, etc.
For Battery connections, 8 AWG can be used to handle 75A continuous (maybe a little lower if stranded)
Stranded likely needed in order to have the required flexibility
For motor connections, each motor draws around 15A (determined when discussing MT-30s)
14 AWG wire (24A) should be enough for ESC connections to PDB