Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Attendance

Smile Khatri

Alison Thompson

Smile Khatri

Calum Chisholm

Evan Janakievski

Thushanth Parameswaran

Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Next Work Session

  • No work session this Saturday

  • Smile Khatri will be in the Bay after the flight test if you have questions

Other Announcements

Alison Thompson

  • We have decided we will be competing in AEAC this year, please read conops:

    View file
    name2025-AEAC-Competition-CONOPS-v1.0-11-September-2024.docx.pdf

  • Plz fill out team roster form for this term! Mandatory for joining the team, complete this AFTER your bootcamp! We will NOT assign you any tasks, give you the bay code, or review your designs until this is done!

...

Item

Presenter

Notes

Meeting

Smile Khatri

  • No mech meeting during reading week and midterm week

    • GL w/ midterm exams!

Comp Design

Alison Thompson

  • Megan Spee payload updates?

    • ABS print in the bay now (holds max 2.7 L). Likely doesn’t need priming for material to be watertight, but would like to test with water hold overnight/long time to make sure.

    • designing “cap” for tank that will also attach to peggy arms (through the bottom plate).

    • Specced a bunch of fittings (https://discord.com/channels/776618956638388305/1293366172518973572 ) in linked thread. most are aquarium style fittings, but not sure how the seals will act on a 3d print. Would like to order them asap for testing!

Megan Spee perception of fittings assembly:

IMG_0745.jpgIMG_0746.jpg

topmost 4 components referenced in discord thread.

IMACS

Smile Khatri

  • Monitor mount is done. Everything has arrived Calum Chisholm

    • image-20241010-225743.pngImage Added
    • May need to r

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

  • Following fixed-wing sync discussion yesterday, might make adjustments to the airframe of Eclipse

    • POR is to use one battery now, can decrease size of the bottom plate or even get rid of it (this would require is being underneath pixhawk not sure about EMI issues)

  • Tail boom support first version was made. Have some adjustments for Sam Wong

  • Drawings by Justin Liu

    • Good start, can we schedule a call to go over these together following midterms?

Tracking Antenna

Sohee Yoon

  • Agapa Goombs any new updates on the base plate redesign? Tracking Antenna Base Plate Redesign

    • Integration is done with the main assembly with a few minor changes to the bottom plate.

    • Gemini Plate standoff mounts were added as well.

  • Angle Limiter: I’ll order more material to waterjet because of tolerance

Fuselage

Sohee Yoon

Wings

Nathaniel Li

  • Sohee Yoon great work on the FEA study!

    • Didn’t fracture even at theoretical max lift force during takeoff

    • Possible fracture at higher lift forces occur at the cutout beside the spar cutout and closer to TE

      • This shouldn’t be a concern unless we go past our targeted velocity of 30m/s and undergo max lift

image-20241010-211947.png
  • Reviewing aileron design options

    • image-20241006-230848.png
    • image-20241008-160445.png
  • Start manufacturing after midterms

  • New tasks:

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=e766ae15-11b0-4638-8dd8-b3ec20ca1e46https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=50a58f23-474b-406c-8a9a-3e47156a17e8https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=cccd9495-792f-4bf8-96b6-611973e48e9b

Tasks

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=5b94de0e-45bc-4665-aae9-a5ded638fed7&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

Next Meeting

Create from Template
spaceKeyMeetings
templateName2362999182
titleYYYY-MM-DD Mechanical Meeting Minutes
templateId2362999182
buttonLabelNew Meeting Minutes