Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  Perform load test on buck converter: use an e-load to saturate a 5V line to 4A rated maximum.
    •  Optionally, load the 12V passthrough XT60-Fs.

Oscilloscope

  •  Load transient testing: Step the e-load and view the transient response from buck converter output.
  •  Battery inrush test: simulate hot-plugging a battery on the input terminal and view transient voltage spike/oscillations.

...