...
- Perform load test on buck converter: use an e-load to saturate a 5V line to 4A rated maximum.
- Optionally, load the 12V passthrough XT60-Fs.
Oscilloscope
- Load transient testing: Step the e-load and view the transient response from buck converter output.
- Battery inrush test: simulate hot-plugging a battery on the input terminal and view transient voltage spike/oscillations.
...