In person

Online

General Updates

  • Merch order

  • Work sessions SCHEDULED

    https://lettucemeet.com/l/n7AK5

    • Tuesdays @ 6pm (sorry we missed this Tuesday)

    • Saturdays @ 3pm (#2 this week! 6S Servo assembly clean-up)

  • Start of term board order

    • Waiting on Meghan Dang to complete order, hopefully monday

    • Kenny Na to order in person with Sarah on Monday (question) !

  • Pick&Place machine

  • Co-ops? (Winter 2025 term)

    • Lowered requirements!

    • winter 2025 term co-op placements were “[awful]”, worst in history

    • 300+ engineering students in need of hire

    • accepting any creative way of getting students co-op credit

    • opening hiring wide open → 4, 5 co-op students, helping on just projects, short terms OK, flex credit possible, unpaid**, will waive in-person requirement**

    • just for this term - not a continuous effort (hopefully spring term is better.)

Flight Test

  • Looked at DMMs, one of them is just cooked even with a new battery and one of them

Flight Tests

  • Last flight test

    • Plan: Test Target Detect using IR camera (Picamera)

    • Cancelled due to lack of reasonable plan, non urgent timeline, and ability to add on another test

    • Will be shifted to the next flight test

...

Pegasus/Competition Updates

  • Was testing a new pump, looks a lot better than the old one

  • We will need 12V on the drone.

    • Must check if PDB has enough current for 12V

    • Alternatively we can buy one off the shelf

    • Test 12s power?

    • High current power module? - test

  • Still need to do an analysis on if the pix can support another 1-2 Servos

  • Anyone interested?

  • Megan Lee

    Did more pump testing

  • Old pumps are garbooo - will not use

  • Tested if the new pump is bidirectional. It is not. That means we will need to buy a second one for the outlet.

  • Tested the new pump past its rated spec and works just fine.

  • This would require about 500mA from a 12V rail and can be controlled with water controller.

  • Did current analysis on the drone with Megan Lee

  • Mech is strongly considering no winch (therefore no servos) after the pump testing

    • Since we arent hanging a pump, it is less risky to leave cable dangling.

    • SSD if needed?

  • Non EE related updates

    • New airframe for tuning is here

      • This is so someone can learn how to tune the drone

      • Should be made this weekend

  • What else should be done?

    • Make more LED boards?

    • Make more SSD?

Eclipse Updates

  • Jerry Tian

  • Maiden flight electrical block diagram is done. Tim Gu is getting started on the harness design. All harness sections below need a harness diagram.

    • fuselage

    • right wing

    • left wing

    • tail

    • power & can splitter (connects all 4 sections above together)

  • Fried ELRS boards?

    • Not installing an antenna while boards is powered up means that transmission line is terminated with an open circuit, wave is getting reflected back and the doubling voltage destroyed the transmitter chip 😞

Project Updates

In order of priority. These are the active design projects.

...

RPi Interface Rev C - Electrical - WARG (atlassian.net) Kenny Na Daniel Puratich

  • On JLCPCB cart and ready to be ordered

  • Trying to order DigiKey components + parts to fix ELRS+Buck

  • Will now be ordering 1x of buck only, 1x of modem only, and 1x of modem + STM

  • 3x of the buck ICs and STM have already been ordered, so some of those will be left spare.

  • Pick & Place would be huge, this board has so many components

12S ESC - Electrical - WARG (atlassian.net) Ethan Abraham& Andrew Chai

...

3S ESC Kenny Na Santosh Erathasari Megan Lee

  • Schematic still underway

    • need to figure out sensing, STM I/O

Tracking Antenna Controller w ELRSAhmed OsmanNolan Haines

...