🛸 General Team Status/Schedule:

  • General Meeting Survey: https://forms.gle/cAzCzf71UqaQvjWh8 Meeting times:

    • EE Meeting: Monday 8-9 PM E5 2103

    • EE Work Sessions: Tuesdays 7-8PM E5 2003 (The Bay)

    • Icarus Sync: Tuesdays 9-10pm E5 2004

    • General: Thursdays 8-9 PM E7 5343

  • Project Updates Discussed in the meeting! Critical Feedback Survey !!!

  • LAST Formal Electrical Subteam MEETING BEFORE EXAMS

Attendance:

🍍 Updates this week!

Cornflakes

April 2 Flight Test

  • If anyone would like to come to the flight test we are highly likely to have vehicle space so please drop a message in Discussion Thread !!! Manufactured all required battery harnesses for the flight test

  • Got Michael’s buck board going for the telemetry tower

Icarus Wiring Diagram + Harnessing

(Michael, Farris, Rayyan, Nolan, Ethan)
  • Ethan:

  • Rayyan:

    • Helped with filling out Power Architecture page

    • Work through Icarus Airside Power Architecture rfc

  • Farris:

  • Michael:

  • Daniel

  • Anni & Megan (Tech Dir & Mech Lead) will be in person Saturday morning, Allison (Mech Cornflakes) will be around in the evenings as well for discussions regarding layout stuff!

  • EE Onsite Work Session (Robson, Elion, Jack)

  • Robson: Tested and verified video transmission from camera to display screen

  • Jack: Started

    • Icarus wiring diagram RFC created and almost ready to merge

    • Progress on layout diagram with Mena, Nolan, Michael and Rayyan

    • Power architecture RFC merged.

    EE Onsite Work Session

    Image Removed

    ZeroPilot Program

    Assembly & Testing (Ethan)

    • Lower priority due to other competition-related tasks which are more important

    Admin

    Purchase Orders (Ethan)

    Bootcamp Revamp (Michael, Kevin, Farris)

    • No meaningful progress has been made in the past week.

    • We want to have this done before next term as recruitment is starting up then!

    • No progress due to flight test taking priority

    Admin

    PCBs

    24-12,5 Buck (Ethan, Michael)

    12-5 Buck (Nolan)

    • Nolan Haines Not present at meeting, to add updates and timeline async

    4S 30A Motor Controller (Muhammad)

    • Worked through most of the review items (all that's left is just laying some GND vias left)

      • Will plan to have another version ready for review tomorrow or Wednesday

    • Took some time to read up on tantalum caps vs ceramic/aluminum, will begin writing something up tomorrow

    • Design completed, awaitting order, see Asana for timeline

    5-24V Boost (Steven)

    Steven Wang Add updates and timeline

  • Has a board size drawn out, working on getting the rules & vias into it this week

  • Feedback to be given asynchronously

  • Plan is to order JLCPCB Order all at the same time

    12S Servo Module (Stanley, Michael, Rayyan)

    • Added most buck components to Altium, still a couple left, had to change some components due to some already being in the library / some out of stock

    Bootcamper Progress Updates

    • Robson - Finished last task; final review this week if possible

      • Get this done!!! :d

      • Hoping to get it reviewed soon!

    • Tom: Watching the buck converter videos and final questions left.

      • I made way too big of a doc for all the questions, and it’s been so long since the beginning that I’ll likely have to study before I’m tested on it. I also did it on my note-taking app, not sure if it’s as convenient to send to someone. Can I reach out at any point to request a review or to be tested?

    • Mena: Meeting setup with Michael to review! Michael: Fixed some small schematic things for overcurrent protection and I/O pages

    • Stanley: Almost finished buck schematic, footprint for mosfet and diode required

    4S Motor Controller

    • Kevin: Will provide a PCB layout review tonight

    Bootcamper Progress Updates

    • Kevin Li:

      • Reviewed Michael and Farris' sections

      • Should I reach out to you both for changes I think would be appropriate to make? Or should I just do them without asking

    • Robson - Did not come in person due to sickness; done bootcamp just need to schedule meeting w/ Michael

    • Tom - Finished bootcamp, doing review after ee meeting with Michael