Big Project | Project | Project Manager |
---|---|---|
Post-Comp Fixed WingEclipse | Wings |
Task Description
...
Constraints | Written By | Append Date |
---|---|---|
Holes should be on the faces parallel to the ground |
| |
Specific hole design is up to you but keep in mind the method of manufacturing since we already have the box tube |
|
Assignees
Assignee | Asana Task | Date |
---|---|---|
@ assignee | link to asana task assigned | Date assigned |
|
Task Progression/Updates
Author:
...
Ben Lovegrove Date:
...
2024/
...
UPDATE TITLE
...
11/14
Spar Weight Saving
I added cheese holes for the spars, they are parallel to the face.
All the holes are 2.5 inches long and a half inch an inch wide. The parts are in inches per Alison Thompson, as it will make it easier to machine.
There are 5 holes all cut through both sides, and are spaced 1 inch apart.
...