F24 Progress

  • Survey results:

    image-20250108-033042.pngImage Added
  • Went from not having a payload to having one!

    • Conceptually works

    • Needs some tuning

  • Comp drone

    • Angled landing gear, tipping bars

  • Eclipse

    • frame was machined and constructed (besides tail boom)

    • wing prototype done

    • final few things to be manufactured

    • need to find way to attach fuselage to frame

    • a few more parts to be designed

    • landing gear needs to be manufactured (already laser cut)

  • Houston

    • new motors ordered

    • needs to be tuned

  • Dallas

    • new landing gear made

  • Tracking antenna

    • new design for base plate

  • Ground station (IMACs)

    • monitor mounted

    • working on case for electrics, switches, keyboard

    • needs to be finalized

W25 Goals

  • Comp payload

    • make it work

    • test with practice

  • Eclipse flying as early as possible

    • end of Feb for mech completion (could conflict with midterms)

    • open to discussing timelines more

    • Camilo PMing assembly for eclipse

    • get a second set of wings

    • collect data by the end of the term

  • New frame

    • coordinate with subteams that want to use it (auto and efs)

    • need list of what we need to put on the frame

    • need this info ASAP

    • get someone from mech just review for quality

  • Ground station case

    • get mounting plate done for this

  • Tacking antenna side

    • CAD finalized and reviewed for redesign

    • manufacturing is low priority

  • Previous goals

    • Eclipse wings → first set of wings flown on Feb 1, second set mid Feb

    • Tail design for eclipse?

  • Houston

Blockers

Tracking antenna:

  • Doubt it’ll be ready for this year comp

  • Plan was to think abt. redesign last term but most of the time was spent on getting the pitch to work mechanically

  • A redesign of the main plate has already been done, it needs to be reviewed formally (couple leads + tracking antenna PM Sohee)

Stepping Down Plans

  • Smile stepping down end of this term

  • Alison + Evan leadership for Spring 2025

  • Alison to step down end of S25

Director Feedback

  • Doing great (heart)

  • Small complaint: more happens in directors channel than it needs to be

    • Needs to be more open

    • Scheduling stuff