  •  Perform load test on buck converter: use an e-load to fully saturate the buck and verify you get the output current expected (stepping the load up to 4A)5V rail to 4A rated maximum.
    •  Optionally, load the 12V passthrough XT60-Fs.

Oscilloscope

  •  Load transient testing: Step the e-load and view the transient response from buck converter output.