Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Attendance

Smile Khatri

Alison Thompson

Thushanth Parameswaran

Smile Khatri

Evan Janakievski

Shawn Henry Dragon

Camilo Artigas Alos

Sacha Missaghian

Sam Sayad

Megan Spee

Nathaniel Li

Ben Lovegrove

Jack Doehler

Jievan Tapajna

Sam Wong

Ryan Scomazzon !!!

Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Next Work Session

Alison Thompson

  • Work session this Saturday

Other Announcements

Alison Thompson
  • at 9am

    • We

    have decided we will be competing in AEAC this year, please read conops:
    View file
    name2025-AEAC-Competition-CONOPS-v1.0-11-September-2024.docx.pdf

    Plz fill out team roster form for this term! Mandatory for joining the team, complete this AFTER your bootcamp! We will NOT assign you any tasks, give you the bay code, or review your designs until this is done!

    • https://forms.office.com/r/ka0MJHJQ9Dwill start with machining spacers for the fixed wing frame

    • Cut CF tube for tank payload

    • Payload assembly

    • Angled landing gear assembly (likely epoxy)

    • Box tube for spars and tail boom

Updates

Item

Presenter

Notes

Comp Design

Alison Thompson

  • Had a design review yesterday, both payloads will be ready for final review by Monday and we will begin manufacturing after thatBoth payloads ready for manufacturing, order has been placed for parts

  • Angled landing gear looking great, final version should also be ready by Monday

  • Layup last weekend failed because epoxy got poisoned.

    • Note to tell Yuchen

  • 2024-11-06 Pegasus Payload & Landing Gear + Eclipse CAD review - Meetings - WARGalmost done, finalizing angle and adding stopper to account for unknown exact barrel dimensions

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

Fuselage

Landing Gear

Ben Lovegrove

Empennage
  • Updates on manufacturing? What needs to happen this weekend?

Tracking Antenna

    • All parts dropped off at student machine shop as well as E3 machine shop

    • Spacers need to be machined as well as spars

      • Drawings for spacers need a final look over but should be fine, simple lathe task

      • Spars drawings will be completed tomorrow for review, holes were added today for gps mount

Empennage

Thushanth Parameswaran

Eclipse Wings

Nathaniel Li

image-20241114-235047.pngImage Added
  • If you guys need to, feel free to work on it off-line and send Smile Khatri the CAD to add into PDM

Ground Station

Smile Khatri

Peggy 2 Jig

Victor Sun Shawn Henry Dragon

Evan Janakievski
  • We have the plan we were just waiting for Victor Sun to get PDM working, seeing as that hasn’t happened CAD will be done these next couple days

New Task

  • We are going to need new holes cut into the baseplate on either side of each battery for the jig

New tasks

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=41641fcc-42d1-56b5-a9ab-6121246aaae8&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2689990670?contentId=2689990670&entryId=f94dd797-f6a8-5503-8a0b-cc86c4a2eb13&savedViewId=8632f752-f88e-4dcc-bf0f-bc4a935e809chttps://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690187266?contentId=2690187266&entryId=5b843151-aca6-43bd-8bfc-266b6a19b35e&savedViewId=96af723e-7587-4107-b690-1ccf37ce5055https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=cccd9495-792f-4bf8-96b6-611973e48e9b&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

Mech leadership roles

Smile Khatri

...