Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Attendance

Smile Khatri

Alison Thompson

Calum Chisholm

Evan Janakievski

Thushanth Parameswaran

Georgia Vachon Westerlund

Nathan Green

Nathaniel Li

Sohee Yoon

Agapa Goombs

Justin Liu

Ben Lovegrove

Camilo Artigas Alos

Keegan Jeewan

Arnav Gupta

Team Announcements

2025-AEAC-Competition-CONOPS-v1.0-11-September-2024.docx.pdf! https://discord.com/channels/776618956638388305/1110252933787963542/1293635047483506840

  • Plz fill out team roster form for this term! Mandatory for joining the team, complete this AFTER your bootcamp! We will NOT assign you any tasks, give you the bay code, or review your designs until this is done!

  • Item

    Presenter

    Notes

    Next Flight Test

    Smile Khatri

    Next Work Session

    Smile Khatri

    • No work session this Saturday, or right after reading week

    • No mech meetings the next 2 weeks

    • Smile Khatri will be in the Bay after the flight test if you have questions

    Other Announcements

    Alison Thompson

    • We have decided we will be competing in AEAC this yearNew conops, please read conops:

    View file
    name

    Updates

    Alison Thompson

    Item

    Presenter

    Notes

    Meeting

    Smile Khatri

    • No mech meeting during reading week and midterm week

      • GL w/ midterm exams!

    Comp Design

    Comp Design

    Alison Thompson

    • Megan Spee payload updates?

      • ABS print in the bay now (holds max 2.7 L). Likely doesn’t need priming for material to be watertight, but would like to test with water hold overnight/long time to make sure.

      • designing “cap” for tank that will also attach to peggy arms (through the bottom plate).

      • Specced a bunch of fittings (https://discord.com/channels/776618956638388305/1293366172518973572 ) in linked thread. most are aquarium style fittings, but not sure how the seals will act on a 3d print. Would like to order them asap for testing!

    Megan Spee perception of fittings assembly:

    IMG_0745.jpgImage AddedIMG_0746.jpgImage Added

    topmost 4 components referenced in discord thread.

    • Jievan Tapajna Victor Sun pump + valve updates?

    • Camilo Artigas Alos landing gear updates?

      • The base design is done, currently looking into implementing anti-tipping bars and create two different configurations for each approach of water retrieval.

    • Agapa Goombs clamping block updates?

    IMACS

    Smile Khatri

    • Monitor mount is done. Everything has arrived Calum Chisholm

      • image-20241010-225743.pngImage Added
      • May need to drill larger holes for the acrylic. To be tested tomorrow

    Eclipse (Fixed-Wing) Airframe

    Evan Janakievski

    • Following fixed-wing sync discussion yesterday, might make adjustments to the airframe of Eclipse

      • POR is to use one battery now, can decrease size of the bottom plate or even get rid of it (this would require it being underneath pixhawk not sure about EMI issues)

        • No EMI issues w/ mounting Pixhawk above the battery confirmed by Daniel - Smile

    • Tail boom support first version was made. Have some adjustments for Sam Wong

      • Can probably use just one space now that we are only aiming for one battery. And if we switch to two batteries can make adjustments as necessary

    • Drawings by Justin Liu

      • Good start, can we schedule a call to go over these together following midterms?

        • Discussed in person will meet after midterms

    Tracking Antenna

    Sohee Yoon

    • Agapa Goombs any new updates on the base plate redesign? Tracking Antenna Base Plate Redesign

      • Integration is done with the main assembly with a few minor changes to the bottom plate.

      • Gemini Plate standoff mounts were added as well.

    • Angle Limiter: I’ll order more material to waterjet because of tolerance

      • this looks good, doesn’t have to be remade right now (smile)

    Fuselage

    Sohee Yoon

    Wings

    Nathaniel Li

    • Sohee Yoon great work on the FEA study!

      • Didn’t fracture even at theoretical max lift force during takeoff

      • Possible fracture at higher lift forces occur at the cutout beside the spar cutout and closer to TE

        • This shouldn’t be a concern unless we go past our targeted velocity of 30m/s and undergo max lift

    image-20241010-211947.pngImage Added
    • Reviewing aileron design options

      • image-20241006-230848.pngImage Added
      • image-20241008-160445.pngImage Added
    • Start manufacturing after midterms

    • New tasks:

    https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=e766ae15-11b0-4638-8dd8-b3ec20ca1e46https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=50a58f23-474b-406c-8a9a-3e47156a17e8https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=cccd9495-792f-4bf8-96b6-611973e48e9b

    Empennage

    Thushanth Parameswaran

    • Design completion by end of October

    • POR to use 2 rods for the spar for the HS and 2 for the VS

    • Going with tapered VS.

    • Haven’t updated the design below for the elevators but there won’t be overlap

    • 3D print control surfaces using LW PLA?

    image-20241009-234107.pngImage Added
    • Spacers for ribs assembly

    Landing Gear

    Ben Lovegrove

    Fixed wing landing gear

    • Front landing gear is done and cheese holes are added

    Screenshot 2024-10-10 150637.pngImage Added
    • Rear landing gear CAD is nearly done

      • I’m currently using the HS - 311 Servo that we already have

      • I also added the CAD for the part to COTS PDM file

        image-20241010-231350.pngImage Added
      • I’m going to be doing sims soon

    • Possible to change front landing gear to 14 GA and run sims to see if it’s valid? Max Thickness we can bend, wanna see if we could go w/ this option - Smile

    Tasks

    Smile Khatri

    https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=5b94de0e-45bc-4665-aae9-a5ded638fed7&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

    https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=208ba978-9bf6-4fef-a330-b59c4548e8e9&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

    Next Meeting

    Create from Template
    spaceKeyMeetings
    templateName2362999182
    titleYYYY-MM-DD Mechanical Meeting Minutes
    templateId2362999182
    buttonLabelNew Meeting Minutes