  • Must be done before the flight test (Saturday May 18th)

    • requirement somewhat dropped but target is before comp to show the judges

    • Prior to competition for 2024 system diagram ← will be changed after comp

  • Is mounting on Pegasus 2 viable? Smile Khatri

    • Confirmed Yes this is the best path forward

  • Which pattern would look best? Nathan Green Emma Chan

    • All White or two green and two red

When is the assembly + photoshoot?Friday May 17th at 6pm (Provided it works for Mech +EFS)

What needs to be done:

MECHANICAL + ELECTRICAL

...

(ASSEMBLY SESSION)

Task

Department

Status

When

Soldering wires on boards & disconnecting headers

Electrical

Saturday (2024.05.18) or Sunday (2024.05.19)

Mounting boards on motors & running wires

Mechanical + Electrical

Saturday (2024.05.18) or Sunday (2024.05.19)

Landing gear full assembly

Mechanical

Saturday (2024.05.18) or Sunday (2024.05.19)

Final checks

Mechanical + Electrical

Saturday (2024.05.18) or Sunday (2024.05.19)

Disassemble

Mechanical

Tuesday (2024.05.21)

  • The boards will be connected to a 3S battery through a buck converter (Project 12V-5V @ 3A Buck Converter Board 2022 (altium.com)) dropping it to 5V

  • Wires (GND & 5V) can be connected in open air (not funneled through tube) or just get an external battery

  • Take pictures at night to abstract the wiring

  • Disassemble

    Should follow the following schematic

Schematic Diagram

...

  • Should follow the following wiring diagram

image-20240515-205321.pngImage Removed

MECHANICAL

  • Mount the controllers onto each arm on the motor mounts Smile Khatri would we be able to get some mechanical people on this

    • Wires (GND & 5V) can be connected in open air (not funneled through tube)

    • Disassemble

EFS

Adjust firmware so that the lights are stagnant for pictures Kelvin Feng Eric Su

...

image-20240518-162218.pngImage Added

  • Mounting should look like this

image-20240517-181202.pngImage Added

EFS

Kelvin Feng Eric Su Richard Dong

Task

Status

Deadline

Flash the firmware with an all white pattern

Done

(2024.05.17) Friday EOD