Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

General notes/questions

  • Must be done before the flight test (Saturday May 18th)

    • requirement somewhat dropped but target is before comp to show the judges

    • Prior to competition for 2024 system diagram ← will be changed after comp

  • Is mounting on Pegasus 2 viable? Smile Khatri

    • Confirmed Yes this is the best path forward

  • Which pattern would look best? Nathan Green Emma Chan

    • All White or two green and two red

When is the assembly + photoshoot?

Friday May 17th at 6pm (Provided it works for Mech +EFS)

What needs to be done:

ELECTRICAL

  • Connect an LED board to each arm on the motor mounts

    • The boards will be connected to a 3S battery through a buck converter (Project 12V-5V @ 3A Buck Converter Board 2022 (altium.com)) dropping it to 5V

    • Wires (GND & 5V) can be connected in open air (not funneled through tube) or just get an external battery

    • Take pictures at night to abstract the wiring

    • Disassemble

  • Should follow the following diagram

image-20240515-205321.png

MECHANICAL

  • Mount the controllers onto each arm on the motor mounts Smile Khatri would we be able to get some mechanical people on this

    • Wires (GND & 5V) can be connected in open air (not funneled through tube)

    • Disassemble

EFS

  • Adjust firmware so that the lights are stagnant for pictures Kelvin Feng Eric Su

    • Please flash the updated code before assembly

  • No labels