General notes/questions
Must be done before the flight test (Saturday May 18th)
requirement somewhat dropped but target is before comp to show the judges
Prior to competition for 2024 system diagram ← will be changed after comp
Is mounting on Pegasus 2 viable? Smile Khatri
Confirmed Yes this is the best path forward
Which pattern would look best? Nathan Green Emma Chan
All White or two green and two red
When is the assembly + photoshoot?
Friday May 17th at 6pm (Provided it works for Mech +EFS)
What needs to be done:
ELECTRICAL
Connect an LED board to each arm on the motor mounts
The boards will be connected to a 3S battery through a buck converter (Project 12V-5V @ 3A Buck Converter Board 2022 (altium.com)) dropping it to 5V
Wires (GND & 5V) can be connected in open air (not funneled through tube) or just get an external battery
Take pictures at night to abstract the wiring
Disassemble
Should follow the following diagram
MECHANICAL
Mount the controllers onto each arm on the motor mounts Smile Khatri would we be able to get some mechanical people on this
Wires (GND & 5V) can be connected in open air (not funneled through tube)
Disassemble
EFS
Adjust firmware so that the lights are stagnant for pictures Kelvin Feng Eric Su
Please flash the updated code before assembly