Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Meeting overview

Meeting to discuss state of Competition Aircraft big quad.

  • Timeline recap

  • Integration recap

  • EE Clarity

๐Ÿซ‚ Attendance


๐Ÿ—’๏ธ The Weekly Recap


โœˆ๏ธ Flight Tests:

  • Vanny SUCCESSFULLY completed auto-tune

  • Noticed thrust loss on Motor 3 after Battery Failsafe โ†’ Investigation ongoing.

    • This is (not) expected behaviour.

  • CV Landing pad detection works.

  • GPS not tested.

๐Ÿ“ฆ New arrivals

  • HERE RTK GPS Base stations here.

  • Carbon Fiber tubes here.

โœ…ย Open action items


@Mech to send EE basic X-frame layout so that EE can come up with wiring diagrams/channels.

@Anni to look at static load testing

Conall Kingshott look at talking to bryan about composites

๐Ÿ“ย Meeting minutes


Frame Updates ๐Ÿš

MECHANICAL

< insert frame updates here >

Sensor Updates ๐Ÿ“

  • RTK GPS?

Motor 3-phase connectors โœ…

MECHANICAL ELECTRICAL INTEGRATION

Battery PDB Distribution (question)

ELECTRICAL

  • How are batteries going to be arranged in series/parallel?

  • How will our board support this layout?

Airside Electrical Layout (error)

ELECTRICAL MECHANICAL INTEGRATION

  • Where each component goes needs to be added to the architecture document.

  • Need selection of proper wire gauges, types, etc.

    • https://www.engineeringtoolbox.com/wire-gauges-d_419.html

    • For Battery connections, 8 AWG can be used to handle 75A continuous (maybe a little lower if stranded)

      • Stranded likely needed in order to have the required flexibility

    • For motor connections, each motor draws around 15A (determined when discussing MT-30s)

      • 14 AWG wire (24A) should be enough for ESC connections to PDB

  • No labels