Attendance

Mechanical:

Electrical:

Embedded Flight Software:

Autonomy:

Operations:

Agenda


Propulsion + Control

Action items / blockers:

Updates:

Mech

Electrical

4 battery harness configuration

are we good with the + configuration for 4 batteries

EFS

Kind of propulsion/control ralated, using 4x 6200mAh batteries instead of 5000mAh ones.

The 6200mAh ones cost $96.09 and weigh 895g each (https://hobbyking.com/en_us/turnigy-heavy-duty-6200mah-6s-60c-lipo-battery-pack-w-xt90.html?___store=en_us ).

The 5000mAh ones cost $75.18 and weigh 838g each (https://hobbyking.com/en_us/turnigy-battery-heavy-duty-5000mah-6s-60c-lipo-pack-xt-90.html ).

Using 4x 6200mAh would weigh 228g more (6.58%) while having 2400mAh more capacity (21.43%). It would cost $83.64 (24.42%) more.

Sensing

Action items / blockers:

  • Sensor calibr/quality test next weekend @ efs

  • Mech needs to mount 360 lidar mount on Houston

    • Do we need a downward facing lidar mount? Do we have lidars we can use?

    • Is this programmed / ready?

Updates:

  • < Decision Documentation >

Mech

Sensor mounts

  • Pegasus mounts for rangefinder and op flow have existed for a while

  • Lidar mount for Houston exists, just needs to be mounted

Electrical

Sensor wiring

  • op flow & rangefinder sensor wiring checked on Pegasus

  • waiting for mech on 360 lidar

Conformal coating on PCB

  • Need clarity on motivation behind conformal coating:

    • is it for waterproofing?

    • Which PCB’s will require conformal coating

    • Will having housings for PCB’s make conformal coating redundant?

EFS

Sensor calibr & quality test

  • Need guidance/pointers on how to do calibration and testing

    • What specific metrics need to be calibrated?

    • What metrics are to be tested and against what values?

  • How much is done so far?

Autonomy

Video System

Action items / blockers:

  • Has this been ordered?

Updates:

Mech

Electrical

EFS

Ardupilot VTX mgmt

  • Clarify requirements

    • What is this task, and what is the end goal?

    • Are there specific steps/action items that EFS should follow?

Autonomy

LTE Comms

  • Haven’t made a choice on which image compression format we want to use

    • Have a couple more tickets where we want to profile different image compression formats

    • We have an influx in new members so we can assign those tickets out

  • Going to start creating the repository to trasnmit images over LTE

    • Will create it so that the image compression format can be added as a module so we are not blocked

  • Going to start assigning directories to team members to clean

Command + Telem

Action items / blockers:

Updates:

Mech

Electrical

RFD900x harnessing

Yuchen is slaying on the breakout PCB, Daniel Puratich will review

EFS

ELRS Gemini status

Assigned Akam to this task. He aims to start work on 23 Jan 2023

Autonomy

  • No progress on looking into what happened with LTE on the flight test

    • Need to delegate to someone onsite

  • Working on getting Geolocation tested

    • We have someone actively working on blocking PR

Airframe - General

Action items / blockers:

Updates:

  • < Decision Documentation >

Mech

Airframe Timeline:

Current due dates for tasks (I’m not gonna read all of these but they are here for visibility):

  • Rev 1 Cabin - to be mounted on pegasus 1.0 by Feb 3rd, best case mounted by Jan 27th

  • Pegasus 2.0 - Assembled by Feb 3rd, possibly Feb 10 (depends on machining time)

  • Rev 2 Cabin - mounted on pegasus (unsure if 1.0 or 2.0) by Feb 17 or 24th

  • Landing gear improvements - to be done Feb 17th

  • Waterproofing - to be done by end of Feb

Electrical

Houston power

raspberry pi harness was made from last term, it was supposed to improve the raspberry pi input voltage, not tested its performance yet, will test it Tuesday, Jan 23rd

EFS

Autonomy

Tracking Antenna - General

Action items / blockers:

Updates:

Mech

CAD and Parts Ordering Status

CAD Review

  • CAD review is tomorrow, , at 6:00pm. Feel free to come by!

  • Upon CAD Review completion, building process will start

Build Status

Funding

  • We are planning to use the following account for purchases: WEEF - Groundstation Equipment Fall 2022

image-20240122-211127.png

image-20240122-211321.png

Electrical

EFS

Autonomy


General Updates

  • phase #1 paper submitted!

Flight test schedule