Team Announcements

Item

Presenter

Notes

Next Flight Test

Smile Khatri

Next Work Session

Smile Khatri

  • No work session this Saturday, or right after reading week

  • No mech meetings the next 2 weeks

  • Smile Khatri will be in the Bay after the flight test if you have questions

Other Announcements

Alison Thompson

Updates

Item

Presenter

Notes

Comp Design

Alison Thompson

  • Megan Spee payload updates?

    • ABS print in the bay now (holds max 2.7 L). Likely doesn’t need priming for material to be watertight, but would like to test with water hold overnight/long time to make sure.

    • designing “cap” for tank that will also attach to peggy arms (through the bottom plate).

    • Specced a bunch of fittings (https://discord.com/channels/776618956638388305/1293366172518973572 ) in linked thread. most are aquarium style fittings, but not sure how the seals will act on a 3d print. Would like to order them asap for testing!

Megan Spee perception of fittings assembly:

IMG_0745.jpgIMG_0746.jpg

topmost 4 components referenced in discord thread.

  • Jievan Tapajna Victor Sun pump + valve updates?

  • Camilo Artigas Alos landing gear updates?

    • The base design is done, currently looking into implementing anti-tipping bars and create two different configurations for each approach of water retrieval.

  • Agapa Goombs clamping block updates?

IMACS

Smile Khatri

  • Monitor mount is done. Everything has arrived Calum Chisholm

    • image-20241010-225743.png
    • May need to drill larger holes for the acrylic. To be tested tomorrow

Eclipse (Fixed-Wing) Airframe

Evan Janakievski

  • Following fixed-wing sync discussion yesterday, might make adjustments to the airframe of Eclipse

    • POR is to use one battery now, can decrease size of the bottom plate or even get rid of it (this would require it being underneath pixhawk not sure about EMI issues)

      • No EMI issues w/ mounting Pixhawk above the battery confirmed by Daniel - Smile

  • Tail boom support first version was made. Have some adjustments for Sam Wong

    • Can probably use just one space now that we are only aiming for one battery. And if we switch to two batteries can make adjustments as necessary

  • Drawings by Justin Liu

    • Good start, can we schedule a call to go over these together following midterms?

Tracking Antenna

Sohee Yoon

  • Agapa Goombs any new updates on the base plate redesign? Tracking Antenna Base Plate Redesign

    • Integration is done with the main assembly with a few minor changes to the bottom plate.

    • Gemini Plate standoff mounts were added as well.

  • Angle Limiter: I’ll order more material to waterjet because of tolerance

Fuselage

Sohee Yoon

Wings

Nathaniel Li

  • Sohee Yoon great work on the FEA study!

    • Didn’t fracture even at theoretical max lift force during takeoff

    • Possible fracture at higher lift forces occur at the cutout beside the spar cutout and closer to TE

      • This shouldn’t be a concern unless we go past our targeted velocity of 30m/s and undergo max lift

image-20241010-211947.png
  • Reviewing aileron design options

    • image-20241006-230848.png
    • image-20241008-160445.png
  • Start manufacturing after midterms

  • New tasks:

https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=e766ae15-11b0-4638-8dd8-b3ec20ca1e46https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=50a58f23-474b-406c-8a9a-3e47156a17e8https://uwarg-docs.atlassian.net/wiki/spaces/Meetings/database/2690252803?entryId=cccd9495-792f-4bf8-96b6-611973e48e9b

Empennage

Smile Khatri

Thushanth Parameswaran

  • Design completion by end of October

  • POR to use 2 rods for the spar for the HS and 2 for the VS

  • Going with tapered VS.

image-20241009-234107.png

Landing Gear

Ben Lovegrove

  • Front landing gear is done and cheese holes are added

Screenshot 2024-10-10 150637.png
  • Rear landing gear CAD is done

    • I’m going to be doing sims soon

Tasks

Smile Khatri

https://uwarg-docs.atlassian.net/wiki/spaces/MEC/database/2690252803?contentId=2690252803&entryId=5b94de0e-45bc-4665-aae9-a5ded638fed7&savedViewId=5dfb42ac-27f2-4e99-b51e-c8c4fdd071a4

Next Meeting